Improving Work Request Processes Beyond Tickets

Enhancing work request processes involves more than just moving beyond traditional ticket systems. It's about adopting comprehensive strategies to ensure efficiency, safety, and optimal performance in industrial environments. In this guide, we'll explore the best practices for improving work request processes, focusing on the complete lifecycle of industrial inspection, safety, and maintenance.

What Are Work Request Processes?

Work request processes are systems implemented to manage, assign, and track maintenance work. These processes ensure that both planned and unplanned maintenance tasks are carried out efficiently and effectively. Traditional ticketing systems have limitations, which can be overcome with modern strategies and tools.

Why Improve Work Request Processes?

  • Enhances operational efficiency
  • Lowers downtime
  • Improves safety and compliance
  • Boosts asset reliability and longevity
  • Reduces maintenance costs

How to Conduct Effective Work Request Processes?

  1. Identify and Document Maintenance Needs
  2. Use Advanced Maintenance Software (CMMS)
  3. Implement a Preventive Maintenance Schedule
  4. Conduct Regular Training and Audits
  5. Measure and Review Work Request Outcomes

When Should You Conduct Work Request Processes?

Work request processes should be continuous, adapting to the operational demands and the state of assets. However, critical moments include:

  • During planned preventive maintenance
  • Post-emergency maintenance
  • At scheduled equipment inspections
  • Following significant operational changes
  • Prior to regulatory compliance checks

The Need for Advanced Work Request Processes

The ever-evolving industrial landscape necessitates advanced work request processes that can quickly adapt to changes. Notably:

  • Incorporating IoT and predictive analytics
  • Ensuring data-driven decision-making
  • Boosting overall equipment effectiveness (OEE)

Tools to Use in Work Request Processes

  • CMMS (Computerized Maintenance Management Systems)
  • Asset Management Software
  • IoT Sensors and Predictive Analytics Tools
  • Safety Compliance Software
  • Mobile Maintenance Applications

Key Features of Effective Work Request Processes

  • Accessibility and Usability
  • Integration with Existing Systems
  • Automation Capabilities
  • Real-time Monitoring and Reporting
  • Scalability for Growing Operations

Overcoming Challenges in Work Request Processes

Common challenges include resistance to change, insufficient training, and high initial setup costs. These can be mitigated by:

  • Supporting continuous employee training
  • Providing comprehensive onboarding and support
  • Demonstrating the long-term ROI of efficient processes

FAQs on Work Request Processes

1. What is a Work Request?

A work request is a formal process for requesting maintenance work to be performed on equipment, facilities, or systems.

2. How Does a CMMS Aid Work Request Processes?

A CMMS automates and streamlines work request management, ensuring quick assignment, tracking, and resolution of maintenance tasks.

3. What Are the Benefits of Predictive Maintenance?

Predictive maintenance uses data and analytics to predict potential equipment failures, helping to prevent downtime and reduce maintenance costs.

4. How Often Should Preventive Maintenance be Scheduled?

The frequency depends on the specific equipment and operational needs but typically ranges from weekly to yearly.

5. What Role Does Safety Compliance Play in Work Request Processes?

Ensuring safety compliance minimizes risks and legal liabilities, protecting both employees and company assets.

Sign up now Try for Free