Affordable 4-20mA Pressure Transducer for PID Control in Wastewater Applications

Question:

I'm seeking recommendations for an affordable 4-20mA transducer compatible with a Variable Frequency Drive (VFD) for a PID control loop in a wastewater application. Currently, the system employs a soft start, but it is causing excessive pressure in the line. Therefore, any transducer I choose will likely require a durable mounting solution, possibly involving welding onto the steel piping. I have a wide range of mounting options available since it's a blank slate at this stage. While I have experience with constant pressure water systems, this will be my first venture into constant pressure wastewater systems. Ideally, I’m looking for a transducer with a measurement range of 0-250 psi to provide some buffer. I anticipate that the final operating pressure will be between 75-150 psi. Any insights would be greatly appreciated! Thank you.

Top Replies

I have experienced great success with the high-quality pressure sensors offered by IFM. Their reliable performance has significantly enhanced my projects.

While I have previously utilized Endress+Hauser products, they may not be the most budget-friendly option available on the market.

When selecting a quality transmitter, you can't go wrong with reputable brands like E+H, Foxboro, Keller, and others that have proven reliable over the years. One crucial factor to keep in mind is the inclusion of a gauge isolator, which ensures that your transmitter is not directly exposed to untreated sewage. This protective device can typically be sourced from your transmitter supplier, who may offer it alongside your instrument. For more information about gauge isolators, visit these links: [BEC Controls Gauge Isolators](http://www.beccontrols.com/gauge-isolators.html) and [Chemline Gauge Isolators](http://www.chemline.com/gauge-isolators/).

We rely on "Automation Direct" for similar applications. Our installation takes place in a saltwater tank used for oil field injection, where we connect it to a Schneider Altivar 630 Variable Frequency Drive (VFD). The VFD operates using a Proportional-Integral-Derivative (PID) control system to pump saltwater back into the well. This meticulous setup ensures that the tank's water level is maintained with exceptional accuracy, nearly matching the predetermined settings.

Looking for a reliable yet affordable 4-20mA transducer to integrate with a VFD for a PID loop on a wastewater system? Currently using a soft start, but experiencing over-pressurization issues? I'm exploring transducer options, and I may need to weld a fitting onto the steel line for installation. The mounting solution is flexible right now. While I have experience with constant pressure water systems, this will be my first constant pressure wastewater system. I'm targeting a pressure range of around 0-250 psi to allow for some leeway, estimating that operational pressure will settle between 75-150 psi. Any suggestions would be greatly appreciated! In response, rupej shared their positive experiences with IFM’s pressure sensors. I found that the IFM PT2424 and PT2434 models could be appropriate choices. Both models come equipped with NPT fittings for easy integration. For more information, you can check them out here: [IFM PT2424](https://www.ifm.com/products/us/ds/PT2424.htm) and [IFM PT2434](https://www.ifm.com/products/us/ds/PT2434.htm). Thank you for your insights!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQ 1: What is a 4-20mA pressure transducer, and why is it used in wastewater applications?

Answer: Answer: A 4-20mA pressure transducer is a device that converts pressure measurements into an electrical signal that varies between 4 and 20 milliamps. This signal is used for monitoring and control in industrial processes. In wastewater applications, it helps maintain consistent pressure levels in the system, which is crucial for efficient operation and prevents equipment damage.

FAQ: FAQ 2: How does a 4-20mA transducer integrate with a Variable Frequency Drive (VFD) in a PID control loop?

Answer: Answer: In a PID control loop, the 4-20mA transducer provides real-time pressure data to the VFD, which adjusts the speed of pumps or motors based on this input. The PID controller processes the transducer signal, compares it to a setpoint, and sends corrective commands to the VFD to maintain the desired pressure, ensuring stable and efficient system operation.

FAQ: FAQ 3: What considerations should be made for mounting a pressure transducer in a wastewater system?

Answer: Answer: When mounting a pressure transducer in a wastewater system, it's important to ensure the mounting solution is durable and resistant to the harsh conditions typical in such environments. Options might include welding the transducer onto steel piping or using robust brackets. The mounting should also allow easy access for maintenance and ensure accurate measurements by

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →