Are AD Productivity PLCs the Right Choice? User Recommendations and Insights Needed!

Question:

I am currently working on a controls design project involving conveyor systems, and my client has emphasized cost reduction as a top priority. Their facility is already equipped with European AB and Siemens machines, but they are deterred by the high software costs and proprietary limitations imposed by their European OEMs. As a result, they chose to develop their own machinery. At this time, they do not possess the necessary software for the existing machines and are open to various future options. The client aims to begin with a straightforward system while ensuring scalability for enhancements such as machine vision, inventory management integration, and connections to other production lines. Consequently, I am looking for a robust yet cost-effective solution to implement a relatively advanced system for this simple application. The Productivity 2000/3000 PLC caught my attention as I've heard positive feedback about it. This PLC must be capable of communicating with 10 VFDs over a network, likely utilizing Ethernet I/P, so it's essential that the selected PLC includes built-in communication function blocks and offers seamless networking capabilities. Additionally, it should handle PID control effectively, but we do not anticipate extensive complexity in the near future. I've reviewed the specifications, and on paper, it seems like an ideal choice. However, I’m seeking feedback from users who have firsthand experience with this system. Is it as effective as it appears? Is it user-friendly? My previous experience with Automation Direct's older software (DirectSOFT) was not satisfactory, so I’m hoping the newer offerings are significantly better. If the software proves to be inefficient and extends my programming timeline, the anticipated cost savings will diminish. As a primarily Omron-oriented professional with some Rockwell background, I would appreciate any recommendations or insights regarding this PLC and software. Thank you for your help!

Top Replies

I haven't had the chance to try them out since they're not widely accessible on this side of the ocean, but I'm intrigued by the idea, especially after reading the positive reviews on this site. I recall that Automation Direct offers free simulator software bundled with their products, which could help save costs, depending on how project billing is structured.

For the past year, we’ve experienced exceptional service with the P3000 while collaborating with an OEM partner. We utilize E/IP technology for 3-5 drives, which closely matches the form and functionality of Allen-Bradley's product line. The software solutions released by AD for the three new series—DoMore, Click, and Productivity—are significantly superior to the previous DirectSoft platform. I truly hope I never have to revert to the older version.

I anticipate that you may encounter limitations with the number of EtherNet/IP (E/IP) connections for managing 10 drives. However, these connections can effectively interface with a wide variety of GS drives from Allen-Bradley (AD). Additionally, I currently have approximately seven P2000 panels in operation, all of which are functioning optimally. The oldest unit has been in service for around two years and continues to operate smoothly without any issues. Each panel utilizes multiple Proportional-Integral-Derivative (PID) controllers for environmental regulation and communicates seamlessly with a local Human-Machine Interface (HMI) at each location. Furthermore, these panels are integrated with my Ignition system, which serves as a comprehensive plant-wide interface. Although the programming experience may not be as refined as that of Rockwell, it does offer numerous helpful shortcut features, and I have found the transition to be quite manageable.

I want to take a moment to highlight their exceptional tech support! I've reached out multiple times, and every experience has been outstanding with immediate access to knowledgeable assistance. Remarkably, I haven't encountered any waiting times, and the service is completely FREE! For users like me, that is incredibly valuable. Please note that I haven't explored the Productivity series yet. However, I have extensive experience with the DoMore PLCs. The Productivity line has always intrigued me, especially since the launch of the 2000 model. Despite this interest, I feel confident in my understanding of DoMore and don’t believe the switch would be worth the effort at this time.

Consider the AB Micro800 series controllers as a cost-effective alternative to other Allen-Bradley (AB) product lines. These controllers are significantly more affordable and come with the advantage of free programming software. However, they may present some challenges for users familiar with other AB programming environments. Despite this, the Micro800 series remains an excellent choice for customers seeking a reliable solution that bears the trusted AB brand without the added expense of proprietary programming software.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: A1: When selecting a PLC for a cost-sensitive project, it's important to balance cost with functionality. Key considerations include:

Answer: - Compatibility with existing systems and equipment. - Support for necessary communication protocols (e.g., Ethernet I/P for networking). - Scalability for future enhancements like machine vision and inventory management. - User-friendly software that minimizes programming time. - Built-in communication function blocks and robust PID control capabilities.

FAQ: A2: A client might opt to develop their own machinery to:

Answer: - Reduce costs associated with high software expenses from European OEMs. - Avoid proprietary limitations that come with OEM machines. - Gain more control over the machinery design and features. - Ensure scalability and customization according to specific operational needs.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →