Automatically Clear Red Lion HMI Event Viewer Events - Graphite G09 Time Period Solution

Question:

I have been struggling to find a solution for automatically clearing the event viewer on a Graphite G09 after a specific time period. Does anyone have any tips on how to achieve this? Additionally, I am encountering a recurring issue with the internal clock and alarm system on all of my Red Lion HMIs. The clock consistently falls behind the set time by an hour. Has anyone else encountered this issue and found a solution?

Top Replies

To optimize your industrial processes, consider utilizing the ClearEvents() command in the Scripting language. It is important to specify the version of Crimson software you are using. The Reference Manual for Crimson® 3.1, which contains a comprehensive list of commands, can be found at www.redlion.net. Additionally, explore the newest features and enhancements in Crimson 3.1 software by accessing Red Lion's revision history on the website. For assistance with the clock settings, check the Timezone and Daylight savings options for potential solutions. Visit the bottom of the page for more information.

I am currently using software version 3.1. To set up the clock on my device, I have utilized a Time and Date Primitive and configured it as a data entry. However, there seems to be a discrepancy in the time displayed by the clock. Despite setting the internal clock to 6/28/2024 8:30 AM, the time shown on the alarm viewer appears to be around 7:10 AM. I have made sure that the time manager is enabled, while the time server SNTP, time client, and time source are all disabled, with the time zone set to local. Additionally, the alarm viewer is set to display time in a 12-hour (civil) format. Regarding the ClearEvents() command, I am unsure where to input this script. I have not been able to locate a suitable place within the event viewer primitive.

Are your historical dates incorrect in Redlion's Crimson software? Updating firmware to the latest version can help resolve this issue. You do not need to place the script in the primitive; instead, consider setting up a Tag trigger to clear Event History after a specific time period. For more information on managing time in Crimson, refer to Redlion's guide here: https://support.redlion.net/hc/en-us/articles/360016367932-Working-with-Time-in-Crimson. This resource also explains how to schedule tasks using Triggers for Tags.

It appears that the dates and times in the alarm/event viewer on my device are not reflecting the changes I make to the Time/Date Primitive setting. I attempted to send the time via crimson, but it did not affect the date or time displayed. I will attempt to resolve this issue by updating the firmware. Additionally, I now understand how to clear the event history, which was previously unclear to me. Thank you for providing the solution.

One aspect that I am unclear about is the event clear function. In the example provided with the red lion code, specifically, GetHour(GetNow()) ==5, this will activate a trigger at midnight. What does the ==5 signify in this script exactly? My goal is to automatically clear events after a 3-day period. Therefore, I presume the script should involve something like GetDay(GetNow) == ?. I am unsure of the significance of the number 5 or what specific integer I should use to activate a trigger after 3 days have passed.

For the Graphite G09, you might want to look into using scripting with the Crimson software, as it can help automate tasks like clearing the event viewer after a set time. As for the internal clock issue on your Red Lion HMIs, I’ve faced this too and found that it often helps to check the time zone settings and make sure Daylight Saving Time adjustments are set correctly in the configuration. Sometimes a firmware update can also resolve timing quirks, so that's worth checking out as well!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I automatically clear the event viewer on a Red Lion Graphite G09 HMI after a specific time period?

Answer: - One approach to achieve this is by utilizing scripting or programming capabilities of the HMI to periodically clear the event viewer based on a predefined time interval. You may need to consult the HMI's user manual or seek assistance from Red Lion's technical support for specific guidance.

FAQ: 2. I am facing a recurring issue with the internal clock and alarm system on my Red Lion HMIs, where the clock falls behind by an hour. What could be causing this problem and how can it be resolved?

Answer: - The issue with the clock falling behind on Red Lion HMIs may be related to the time synchronization settings, daylight saving time configurations, or hardware malfunction. You can start troubleshooting by checking the time settings, ensuring proper synchronization with a reliable time source, and verifying daylight saving time settings. If the problem persists, consider contacting Red Lion's technical support for further assistance.

FAQ: 3. Is there a recommended solution for addressing the internal clock discrepancy issue on Red Lion HMIs?

Answer: - To address the internal clock discrepancy problem on Red Lion HMIs, you can try recalibrating the clock settings, updating the HMI firmware to the latest version (if available), and ensuring that the HMI is connected to a stable power source to prevent time drift. It is advisable to also review any known software bugs or patches provided by Red Lion