Best Cables for Connecting Allen-Bradley Kinetix 350 Servo Drive to MPL-A230P-VJ72AA Servo Motor.

Question:

Greetings! I am in possession of an Allen-Bradley Kinetix 350 servo drive, model 2097-V33PR5-LM, and a MPL-A230P-VJ72AA servo motor. Can you please advise on the appropriate Allen-Bradley power and motor feedback cables required to establish the connection between the two devices? For visual reference, images can be found at https://imgur.com/a/VL4khya. Thank you for your assistance.

Top Replies

If I wanted to create my own D15-pin end by using a threaded motor connection cable, how can I accomplish this task? It seems that the pinout documentation for motor feedback varies. While the TS+ and TS- pins are visible on the motor pinout, only the TS pin appears on the Kinetix pinout. Is it necessary to have the S1, S2, and S3 signals (Single-ended 5V Hall effect commutation) found on the Kinetix 350 pinout? These signals are not present on the motor. Additional images can be viewed here: https://imgur.com/a/suGpYB0.

I decided to repurpose a 2090-CFBM7DD-CEAA09 cable for providing feedback, along with using alligator clips for power temporarily until I can access the distributor.

Have you found a solution to make a Bradley servo run like a stepper motor? I'm looking for ideas on how to achieve this.

Inquiring about the appropriate power and motor feedback cables for connecting an Allen-Bradley Kinetix 350 servo drive and servo motor, specifically the 2097-V33PR5-LM and MPL-A230P-VJ72AA models? See images for reference on Allen-Bradley Kinetix 350 cable connection to servo motor. Consider using the following cables with corresponding CAT numbers for optimal performance: MP-Series 7m Feedback Cable (CAT no: 2090-CFBM7DF-CDAF07) and MP-Series 7m Servo Power Cable (CAT no: 2090-CPWM7DF-16AA07).

Hi there! For your Kinetix 350 servo drive and MPL/A230P/VJ72AA servo motor setup, you're going to need an Allen-Bradley power cable part no.2090-CPBM7DF-16AF05 and a motor feedback cable, part no 2090-CFBM7DC-CEAA05. Both of these should work seamlessly to connect your motor and drive. Do remember to double-check compatibility before purchasing. Hope this helps!

Hello! For your Allen-Bradley Kinetix 350 Servo Drive and MPL motor, you would need power cable part number 2090-CPBM7DF-16AF20 for your power connection. For your motor feedback, I'd recommend using the 2090-CFBM7DF-CEAA20 cable. These cables should allow you to establish a firm and reliable connection between your servo drive and motor. Just a note: check the manual or consult a professional if you're unsure about the installation process, to avoid any potential damage to your devices.

Hey there! For your Allen-Bradley Kinetix 350 servo drive and MPL-A230P-VJ72AA servo motor, you're likely to need power cable part number 2090-CPBM7E7-16AF05 and the motor feedback cable number 2090-CFBM7DF-CEAA05. Please do double-check these details with an Allen-Bradley sales representative or support technician as incremental encoder configurations and environmental conditions may require specific cables. Stay safe and happy wiring!

Hey there! For your Allen-Bradley Kinetix 350 servo drive and MPL-A230P-VJ72AA servo motor, you'll typically need the 2090-CA2-DC020 and 2090-CA2-DC040 cables for the power and feedback connections, respectively. Just make sure to double-check the pinouts and compatibility in the manuals to avoid any hiccups. If you haven't done so, you might also want to check out the Kinetix 350 documentation for any specific recommendations or installation tips. Good luck with your setup!

Hi there! For connecting the Kinetix 350 servo drive and the MPL servo motor, you'll need the 2090-Cable **Power Cable** for the drive, and for the feedback, the 2090-CTXx feedback cable should be compatible. Just ensure you select the correct length and connectors that match your setup. Checking the product documentation might also help clarify any specific requirements for your installation. Hope this helps you get everything up and running!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. What are the recommended cables for connecting an Allen-Bradley Kinetix 350 servo drive to an MPL-A230P-VJ72AA servo motor? - To establish a connection between the Allen-Bradley Kinetix 350 servo drive and the MPL-A230P-VJ72AA servo motor, you will need appropriate power and motor feedback cables. It is recommended to refer to the manufacturer's guidelines or documentation for specific cable requirements.

FAQ: 2. Where can I find visual references for the cable connections between the Kinetix 350 servo drive and the MPL-A230P-VJ72AA servo motor?

Answer: - Visual references for the cable connections can be found at https://imgur.com/a/VL4khya. These images can help you determine the proper setup for connecting the two devices.

FAQ: 3. Are there any specific considerations to keep in mind when selecting cables for this connection?

Answer: - When selecting cables for connecting the Kinetix 350 servo drive to the MPL-A230P-VJ72AA servo motor, it is important to ensure compatibility with both devices in terms of power ratings, signal transmission requirements, and connector types. Consulting with Allen-Bradley or a certified distributor can help in choosing the appropriate cables.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →