Best Ethernet IP Controlled Stack Lights with EIP Compatibility

Question:

I am in search of suggestions for an Ethernet IP controlled stack light. I have come across a few options with Io Link, as well as some that are standard TCP/IP Ethernet and a couple with Modbus TCP. However, I have yet to find a model directly compatible with EIP. Can anyone provide recommendations for EIP stack lights?

Top Replies

Patlite offers a range of Modbus TCP/IP signal towers that can be easily integrated into your PLC programming to control and manage.

I am closely monitoring this discussion as I have been in search of a suitable solution for quite some time. The Balluff Smartlight with IOLink came closest to meeting my needs, and I achieved control over the light by using an E/IP to IOLink bridge. While this solution came at a high cost, I must say, the light it provides is truly impressive.

I'd definitely recommend taking a look at the Banner Engineering's K50L2 Series Indicator Lights. These stack lights provide direct compatibility with Ethernet IP and offer excellent brightness and color visibility. They're also made to be durable and easy to install. They may be a bit pricier than some other options out there, but you really do get what you pay for in terms of quality and reliability.

I'd recommend taking a look at the models offered by Banner Engineering. They've got a range of stack lights that come with Ethernet/IP compatibility. What I particularly like about their models is the level of customization available—you can select different colors, sounds, and functions depending on your requirements. Plus, their user interface is quite intuitive which makes configuration a breeze.

You might want to check out the offerings from Rockwell Automation. They have an array of hardware that is compatible with Ethernet IP including industrial stack lights. Also, another route to consider might be using an EIP compatible PLC or exchanger to control a standard stack light - this way you can expand your choice of stack light models.

I totally get the struggle! If you're specifically looking for Ethernet/IP stack lights, I'd recommend checking out brands like Banner Engineering or Siemens, as they've been developing some robust options for industrial applications. For example, Banner's Liquiline series has some great Ethernet/IP-enabled stack lights that might fit your needs. Just make sure to confirm compatibility with your system, as the EIP support can vary between models. Good luck with your search!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. What are some recommended Ethernet IP controlled stack lights that are directly compatible with EIP? - While there are stack lights available with Io Link, standard TCP/IP Ethernet, and Modbus TCP compatibility, finding models directly compatible with Ethernet IP (EIP) may be more challenging. It is advisable to reach out to manufacturers or suppliers specializing in industrial automation equipment for specific recommendations.

FAQ: 2. Can stack lights with other industrial communication protocols be used with EIP networks?

Answer: - In some cases, stack lights designed for protocols like Io Link, TCP/IP Ethernet, or Modbus TCP may be integrated into an EIP network using appropriate gateway devices or converters. However, for seamless integration and optimal performance, it is recommended to choose stack lights explicitly designed for EIP compatibility.

FAQ: 3. Are there any considerations to keep in mind when selecting an Ethernet IP controlled stack light?

Answer: - When choosing an Ethernet IP controlled stack light, factors such as compatibility with existing EIP infrastructure, ease of integration, reliability, visibility, and customization options should be considered. It is essential to consult with experts in industrial automation to ensure the selected stack light meets the specific requirements of the application.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →