Best Machines for Safely Removing Molded Grilamid Without Scratching Black Components

Question:

Hello everyone! I'm looking for a machine that can effectively remove molded grilamid (transparent plastic) without scratching the black component. If you have any recommendations or insights on this process, your input would be greatly appreciated. Thank you!

Top Replies

It appears that the black plastic component may need to be extracted from the Grilamid mold. Are either of these parts flexible? If not, I’m unsure how they can be removed without potentially damaging at least one part in the process. If you need to secure the black tube, you might consider inserting an inflatable tube for stability.

Consider creating a specialized fixture for your arbor press designed to securely hold a clear plastic component, with the black tube oriented upwards to stabilize the base of the clear piece. Next, develop a custom head for the arbor press that fits snugly inside the black tube, ensuring it maintains its shape. This design should feature a flange that applies pressure to the top of the tube, effectively pushing the black piece out of the clear component without causing deformation.

Before considering the use of a machine for a task, it’s essential to understand how to accomplish it manually. If you can’t determine a manual method, relying on machinery may not be effective. While air pressure typically avoids scratching surfaces, it can sometimes lack strength. In contrast, water pressure has the capability to move even the heaviest obstacles.

BryanG remarked: Before considering an automated machine for the task, have you thought about how to accomplish it manually? If you can’t find a method for manual execution, you won’t succeed with a machine either. According to their insights, they achieve this through machining processes, yet they are expressing concerns about damage to the black surface.

As I mentioned earlier, you can easily "blow" them out without worrying about scratches, as air won't cause any damage. The clear plastic features convenient grooves that provide a secure grip and create a tight seal at the end.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →