One of my clients uses Wonderware and FTView in different sections of their facility. They are looking to set up a backup PC that can be used with either system in case of a PC breakdown. While I understand the importance of addressing licensing and keeping both applications updated, my main concern is whether both software packages can coexist on the same PC without any interference. Can Wonderware and FTView be installed on the same computer seamlessly? Thank you in advance for your help.
Perhaps this idea is too simplistic, but have you considered virtualizing each system in individual virtual machines (VMs) and then only running the necessary one on the backup PC when needed? This approach can streamline the process and ensure that resources are utilized efficiently.
In my experience, I have successfully run both applications simultaneously on a high-performance PC. These applications are not lightweight, so a robust system is necessary. We used both applications to connect to various PLCs and systems.
Thank you, Dravik, for your input. I appreciate hearing that. Hardware should not be a major concern for us, as we typically use robust hardware for our HMI systems to ensure that they remain efficient and up-to-date. Our HMIs are built to handle heavy hardware to keep up with advancements in technology. In our case, the apps won't be running simultaneously, so it's more of an either/or scenario.
I appreciate your input, mort81. Virtualization is a feasible option that I had not previously explored, and although it should be effective, navigating Microsoft's licensing policy may present some challenges.
Maximize the efficiency of your SCADA servers by virtualizing them and creating redundant backups in various locations. In the event of hardware failure, easily deploy the latest VM backup onto any new PC hardware. Say goodbye to installations and activations - simply duplicate the VM and start running with ease. This seamless process ensures minimal downtime and maximum uptime for your critical systems.
Absolutely, Wonderware and FactoryTalk View (FTView) can be installed on the same computer without interference. Both are independent SCADA systems and their installation directories and executions do not overlap or interfere with each other. As long as the PC has the required processing power and memory to handle both applications, you should be fine. I would, however, recommend you to periodically monitor the system resources to identify any potential performance issues.
Yes, you can install both Wonderware and FTView on the same PC without any conflicts. These are two different SCADA software packages which shouldn't interfere with each other's function since each has its own separate runtime environment. Just ensure both systems meet the PC's hardware and OS requirements. For smooth operation, a higher spec PC might be required to handle the demands of both software packages running simultaneously. Also, keep a keen eye on individual updates as they might need to be managed separately.
In my experience with deploying both Wonderware and FTView on the same machine, I've found they generally play well together, but with a few caveats. It's crucial to ensure your PC has enough processing power and RAM to handle both applications running simultaneously, since these SCADA systems can be resource-demanding. Also, pay attention to the installation order and shared dependencies, such as .NET Framework - to avoid any possible conflicts. Finally, each software should ideally be configured to use different IP addresses when communicating with PLCs in your facility to ensure network traffic is properly managed. So, yes, they can coexist, but a mindful setup and a robust machine are key.
Absolutely, both Wonderware and FTView can coexist on the same PC without any issues, provided the hardware resources (CPU, Memory, Disk space, etc.) are sufficient. However, It’s crucial to ensure that neither application's configurations disrupt the other’s behavior. On a side note, I would suggest setting up Virtual Machines to segregate the two systems, ensuring even greater stability and isolating potential software conflicts. Licensing, common protocols, and maintaining updates as you've mentioned are likewise key considerations.
✅ Work Order Management
✅ Asset Tracking
✅ Preventive Maintenance
✅ Inspection Report
We have received your information. We will share Schedule Demo details on your Mail Id.
Answer: - Yes, Wonderware and FTView can coexist on the same PC seamlessly. It is essential to ensure proper licensing and keep both applications updated to avoid any compatibility issues.
Answer: - When installing both software packages on the same computer, it is crucial to verify system requirements, allocate sufficient resources, and follow installation guidelines provided by the respective vendors to prevent any conflicts.
Answer: - To establish a backup PC that can be used with either system, ensure that the necessary licenses are available for installation on the backup PC. It is recommended to maintain a backup of configuration files and regularly test the backup system to ensure smooth operation during emergencies.