Can You Use the Same RS232 Cable for Omron CQM1 and CJ1M Controllers?

Question:

I have a PC linked to an Omron CQM1 controller, and it functions seamlessly. Additionally, I own a CJ1M controller. Can I use the same RS232 communication cable for both devices?

Top Replies

"What is the cable part number you are currently using? For the CJ1M, I utilize the CN226, and for the CQM1, I rely on the CIF02. The CIF02 features a 20-pin connector arranged in two rows of 10 pins, while the CN226 resembles a mini HDMI connector."

For my CQM1 setup, I possess both a CQM1-CIF02 and a modified RS232 male-to-female cable, although I've never unpacked the CQM1-CIF02. Regarding the CJ1M, is it possible to communicate via the RS232 connection, or is it necessary to use the designated peripheral?

If you're uncertain about the modified cable you're considering, I recommend giving it a shot. Could you share the part number of the cable you're looking to test? I recently experimented with a CN220 cable, and it exhibited some unusual behavior. While I successfully connected the CJ1M to the network using the CN226, the CN220 seemed to connect to the DB9 port briefly before disconnecting. I suspect this might be due to the DB9 port's configuration, as it detects the PLC but fails to upload data—just a theory. It might be more effective to go ahead and purchase a CN226 cable instead. You can find more information about it here: [CN226 Omron PLC Cable](https://www.plccable.com/omron-plc-cable-usb-cs1w-cn226-cs1wcn226-usb-version/). There are several knowledgeable members in the community who specialize in Omron products and could offer additional insights.

To establish a connection with the Serial Port for programming purposes, ensure that DIPSWITCH 5 is switched to OFF. Additionally, configure the Custom Settings in the Host Link Port tab within the PLC. Don't forget to verify that you have the correct pin configurations for your serial cable to ensure a successful connection.

Yes, you can likely use the same RS232 communication cable for both the CQM1 and CJ1M controllers, as they both support RS232 communication. Just ensure that the pin configurations match and that any specific settings for baud rate or communication parameters are properly configured on both sides. If you encounter any issues, it might be a matter of tweaking the settings or checking for compatibility differences, but in general, your cable should work for both!

Great question! Generally, if both your CQM1 and CJ1M controllers support RS232 communication with the same pin configuration, you should be able to use the same cable. However, it's always a good idea to double-check the specific communication settings and pinouts in their respective manuals to ensure compatibility and avoid any potential issues. Happy programming!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: A2: Before using the RS232 cable with different Omron controllers, verify the following:

Answer: - The connectors fit the ports on both the CQM1 and CJ1M controllers. - The pin configurations are compatible with both controllers. - The cable adheres to the RS232 communication standards required by both devices.

FAQ: A3: While using a single RS232 cable for multiple devices is generally feasible, be mindful of the following:

Answer: - Ensure proper handling and connection to avoid damaging the cable or ports. - Confirm that the cable length and quality are suitable for stable communication. - Double-check compatibility to prevent any communication errors or hardware issues.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →