Compatibility of CCW v20+ with Older Micro850 (2080-LC50-*) CPUs - Clarification Needed

Question:

Hello experts, I have a question about the compatibility between the discontinued Micro850 series (2080-LC50-*) CPUs and the latest CCW software version 20 or higher, including version 22. Can these two be used together? I understand that a software version 21 or newer is required to work with the newer 2080-L50E-* CPU models. However, I am curious if the same version of the CCW software is compatible with older models as well. I believe I have a 2080-LC50 CPU with firmware version 7.2 (although I am not certain based on the image I have). If anyone has solid information on this topic (or a link to a relevant online document), please share it to help clarify this for me. Thank you and best regards, AKP. PS. I apologize if this question has been asked before, but I have not found a clear answer yet.

Top Replies

To determine compatibility with your system, simply create a new project in CCW and select a CPU. If your CPU is listed, then it is compatible. For example, I am currently using V22 on my PC which includes all LC50's and L50E's in its compatibility list. It's important to ensure compatibility before proceeding with your project to avoid any issues down the line.

After researching on the Rockwell PCDC website, I found that the 2080-LC50-24AWB firmware versions v12.011 and v12.012 are compatible with CCW v12 and newer, up to v22. If your Micro850 is running on firmware version v12.013, you will need CCW v13 or a more recent version. This information should be relevant to all 2080-LC50 models. The reason I selected 24AWB specifically is because it was the PLC listed first in the options available.

I want to express my gratitude to @JLand and @geniusintraining for their prompt and insightful feedback. I will definitely take their comments into consideration moving forward.

Hey AKP, great question! While Micro850 series (2080-LC50-*) CPUs are a bit older, they're still quite reliable. As far as I know, the newer versions of the CCW software (version 20 and above) should still be compatible with these models. However, the level of functionality might differ depending on the specific version of your CPU and firmware. CCW has quite robust backward compatibility. Your firmware version of 7.2 may or may not have limitations, so make sure to cross-check with the specific CCW software version you're intending to use. For the most reliable source of this information, I would recommend checking out the manufacturer's compatibility documentation on their website. You should be able to find a CPU-software compatibility matrix there, which would give you a definitive answer.

Hi AKP, your query is quite valid. Generally, newer versions of software tend to maintain backward compatibility with older hardware, but that's certainly not always the case. While I don't recall the specifics for the 2080-LC50 CPU and CCW software version 22, I'd recommend checking out Rockwell Automation's official site. They have an extensive library of documentation and compatibility matrices that should provide you with a definitive answer. Or better yet, contacting their support directly should get you a faster and more comprehensive response. You're on the right track, keep digging and good luck!

Hello AKP, from my experience working with these systems, the Micro850 series should be compatible with CCW software versions 20 and higher, despite being an older model. The version requirements mainly exist for the newer CPU models due to their highly advanced features, but older models like yours should function fine. However, compatibility depends largely on the specific features you are utilizing, so I would recommend testing it in a controlled setting first. If you run into issues, consider contacting Rockwell Automation's technical support, or review their product compatibility and download center information online. I hope this helps, and good luck with your project!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Is CCW version 20 or higher compatible with older Micro850 series (2080-LC50-) CPUs? - Yes, CCW version 20 or higher is compatible with older Micro850 series CPUs, including the 2080-LC50 models.

FAQ: 2. What software version is required to work with newer 2080-L50E- CPU models?

Answer: - A software version 21 or newer is required to work with the newer 2080-L50E- CPU models.

FAQ: 3. Can CCW version 22 be used with the 2080-LC50 CPU models with firmware version 7.2?

Answer: - Yes, CCW version 22 can be used with the 2080-LC50 CPU models with firmware version 7.2.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →