Compatible PCMCIA Memory Cards for SIEMENS COROS OP35 Display Panel

Question:

Hello Experts, I am seeking information on the specific type of PCMCIA memory cards/modules that are compatible with SIEMENS' COROS OP35 (6AV3535-1TA41-0BX0) display panels. If anyone has knowledge of a particular model, part number, or SIEMENS Order Number that is known to be supported, please share it here. My recent experience suggests that common ATA Flash type PCMCIA memory cards may not be compatible with the OP35, but I could be mistaken. Unfortunately, reliable information on this discontinued product from 1998 is scarce. If anyone in the community has experience with OP35 and PCMCIA memory cards/modules, please provide assistance. Thank you for your help. Best Regards, AKP P.S. Any insights from @JesperMP would be greatly appreciated.

Top Replies

Hello AK5fa. I may not have a lot of experience with the OP35, but the manual mentions that PCMCI/JEIDA cards up to 16 MB can be used. You could consider trying a Siemens MC card, specifically the 6ES7952-1KS00-0AA0 model used with s7-400, although I can't guarantee it will work. What is the purpose behind wanting to use a PCMCIA card with the OP35? One potential use could be to transfer an image from the OP35 to another identical unit. However, please note that this image cannot be used to extract an editable Protool project from the panel.

JesperMP inquired about the purpose of using a PCMCIA card with the OP35. This can be utilized to transfer an image from one OP35 unit to another identical one. However, it is important to note that the image obtained cannot be used to extract an editable Protool project from the panel. In response to Jesper, I appreciate your quick response! I will verify if we possess S7-400 memory cards for testing with the OP35. The necessity for using a PCMCIA memory card arises from the need to transfer data between OP35 units. Given that the OP35 lacks the Upload function in its Transfer mode, the use of PCMCIA cards appears to be the sole viable option. Kindly correct me if I am mistaken. It should be acknowledged that even with the backup data from the OP35, editing or conversion is not feasible. This was never my aim. Thank you and Warm Regards, AK.

It's true that the most common method to transfer an image to a different panel is through a memory card. The manual suggests that using memory cards necessitates firmware 2.0 on the panel.

JesperMP mentioned in the manual that firmware 2.0 is necessary for using memory cards on the panel. However, the OP35 firmware is currently at version 4.0. Despite this, the manual does not specify any SIEMENS or supported third-party part numbers for PCMCIA cards. In my testing with two different PCMCIA cards of varying capacities and brands labeled as "ATA Flash," the OP35 would freeze immediately upon insertion while the device was powered on. After power cycling, the OP35 would not boot properly and all LEDs on the keys would turn red. Removing the PCMCIA card and restarting the panel was the only way to restore normal operation. It seems that the issue may be related to using the incorrect type of PCMCIA card, possibly not being the suitable type for the OP35. This lack of clarity has been a common point of confusion for users on the SIEMENS support forums since 2011, with no clear specifications provided regarding model numbers or SIEMENS Order Numbers for compatible cards.

I'm sorry, but I don't have any additional information. I recommend looking into Prosave, although the documentation states that it is not compatible with OP35.

Hey AKP, it's been a while since I worked with an OP35, but if memory serves, these old Siemens panels can be quite picky about the PCMCIA cards they acknowledge. As you correctly pointed out, common ATA Flash cards don't usually work. To the best of my recollections, the SIEMENS 6ES7 953-8LF31-0AA0 was a proper fit. If you're having trouble finding one, you might want to look into some malls dealing with obsolete industrial automation components as they sometimes stock these hard-to-find parts. Let us know how it goes!

Hello @AKP, I have some limited experience with the OP35 panels, so I hope this information is helpful. From what I've seen, finding a specific PCMCIA card that works with these older models can indeed be tricky. While ATA Flash types may be incompatible, you might have better luck with SRAM PCMCIA cards, as I've seen them used in similar applications. Some older storage cards might need to be preformatted in a particular way to be recognized by the OP35, but there's no specific part or model number I can recommend. I will echo the sentiment that reaching out to a SIEMENS representative would be best, even for such dated systems. Good Luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What type of PCMCIA memory cards are compatible with SIEMENS COROS OP35 display panels?

Answer: - The specific type of PCMCIA memory cards that are compatible with SIEMENS COROS OP35 display panels may vary. It is recommended to seek information on a particular model, part number, or SIEMENS Order Number that is known to be supported.

FAQ: 2. Are common ATA Flash type PCMCIA memory cards compatible with SIEMENS COROS OP35?

Answer: - The compatibility of common ATA Flash type PCMCIA memory cards with SIEMENS COROS OP35 display panels may not be guaranteed. It is advisable to explore other options based on the specific requirements of the OP35.

FAQ: 3. Is there reliable information available on PCMCIA memory cards for the discontinued SIEMENS COROS OP35 from 1998?

Answer: - Due to the scarcity of information on discontinued products like the SIEMENS COROS OP35 from 1998, it may be challenging to find detailed specifications on compatible PCMCIA memory cards. Seeking assistance from community members with relevant experience is recommended.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →