Connecting Siemens Profinet PLC to Allen-Bradley Ethernet/IP PLC for Tag Access

Question:

I own a Siemens S7-1200 PLC and want to access its tags using my Allen-Bradley ControlLogix PLC. These two controllers operate on different communication protocols, Ethernet/IP and Profinet. Is there a way to achieve this? Can I configure the OPC server to enable communication between the two controllers? Any guidance on how to make this connection work would be appreciated. Thank you.

Top Replies

Siemens offers a comprehensive library of resources for SIOS support, available at industry.siemens.com. This valuable repository provides information and assistance for a wide range of Siemens products and services.

Consider using Modbus TCP as an option for communication. Siemens offers sample programs for CIP communication, but Modbus TCP may be a simpler choice. Best of luck in your endeavors!

Our recent integration of eXware 703 as a gateway has facilitated seamless communication between Siemens PLCs on Profinet and Omron PLCs on EtherCAT. Additionally, the eXware 703 is capable of retrieving data from third-party OPC servers and transmitting it to the Omron PLC. It also has the ability to communicate using Ethernet/IP. This IoT Gateway for Industrial Digitization by EXOR ensures a smooth flow of data from the SOM level, through the gateway, field devices, and up to SCADA and Master level HMI systems, comprehensively addressing current and future needs in industrial automation. Learn more at www.exorint.com.

The most straightforward way to connect an S7-1200 to a ControlLogix system is through a link provided by @simjon71. Alternatively, OPC UA integration is possible. With TIA V16, the S7-1200 can function as an OPC UA server while the ControlLogix can act as an OPC UA client. However, it is important to note that the performance may be limited, making it suitable for handling only a few tags at a moderate frequency. In addition, the S7-1200 supports Modbus TCP, serving as both a client and server. For more information on utilizing Modbus TCP with the S7-1200, refer to this link: https://cache.industry.siemens.com/dl/files/340/102020340/att_118119/v6/net_modbus_tcp_s7-1500_s7-1200_en.pdf

Implementing Modbus communication on a 1200 is straightforward. I have completed several projects involving Wago 750-88x and Click PLCs. Follow the link shared by Jesper to get started. The efficiency of data retrieval depends on the volume of data you require. Dealing with the Rockwell side of Modbus can be challenging. I have included screenshots featuring a 1200 and a Click PLC. To simplify the process, I suggest using a Gateway.

Yes, you can certainly configure an OPC server as a bridge between the two controllers. You'll need an OPC client functionality within the Allen-Bradley ControlLogix PLC and an OPC server functionality for the Siemens S7-1200 PLC. Matrikon, for instance, offers an OPC server for Siemens PLCs that allows for Profinet communication. The key lies in ensuring the PLC tags are configured in a way that both PLCs can comprehend them. Make sure you're familiar with both protocol suites to navigate any potential discrepancies.

Absolutely, you can establish communication between the two. One best practice would be using a Profinet to Ethernet/IP gateway; this hardware will effectively bridge the two protocols. As for the OPC server, it pretty much translates for different protocols, making it possible to create a 'common language' between these two PLCs. However, detailed configurations can vary based on the PLC and OPC server models, so I recommend researching specifics or reaching out directly to the manufacturers for more precise steps to take.

Sure, you can certainly accomplish this but it's somewhat complex. Essentially, you'd want to use a gateway device that supports both protocols. This device would interface with your Siemens S7-1200 PLC via Profinet and your ControlLogix PLC via Ethernet/IP, effectively serving as a translator. Using an OPC server would also be a part of this solution, as it could handle the communication from the gateway device to other software that may require access to these tag values. Look for a reputable industrial automation supplier, they can assist in identifying a suitable gateway device and guide you through your setup.

Indeed, communication between Siemens S7-1200 PLC and Allen-Bradley ControlLogix PLC can be a bit of a challenge due to their different communication protocols. You might want to consider using a gateway device that can bridge Ethernet/IP and Profinet, such as products made by HMS or ProSoft. As for the OPC server, it would indeed be another feasible solution as it allows different types of hardware and software to communicate by converting the various protocol-specific data into a standard model. Ensure you have the correct software tools for your chosen method and are adhering to appropriate safety protocols during the setup process. It might be a bit complex at first, but don't get discouraged. You'll get there eventually!

To facilitate communication between your Siemens S7-1200 and Allen-Bradley ControlLogix PLCs, using an OPC server is definitely a viable solution. You can set up an OPC server that connects to the Siemens PLC via Profinet and then configure your ControlLogix PLC to communicate with that server using Ethernet/IP. There are several OPC server solutions like Kepware or Siemens' own SIMATIC NET that can act as a bridge. Once you have the OPC server configured to read the tags from your S7-1200, your ControlLogix can access those tags as if they were local. Just make sure to pay attention to the timing and data types during the configuration to ensure smooth communication. Good luck!

To connect your Siemens S7-1200 PLC and Allen-Bradley ControlLogix PLC, one effective approach is to use an OPC UA server as a bridge. You can set up an OPC server that supports both Profinet and Ethernet/IP, allowing for seamless communication between the two systems. Once configured, you'll need to map the tags from the S7-1200 in the OPC server, which can then be accessed by the ControlLogix PLC. Make sure you check compatibility and settings for both PLCs during this process, as proper IP addressing and routing are crucial. Lastly, consult the documentation for your specific OPC server for detailed setup instructions!

Absolutely, you can bridge the communication between your Siemens S7-1200 and Allen-Bradley ControlLogix PLC using an OPC server as a middleware solution. You'll want to set up an OPC UA or DA server on the Siemens side, allowing it to expose its tags. Then, you can configure your ControlLogix to act as an OPC client to read those tags. Make sure to check the compatibility of the OPC server software with both PLCs, and don’t forget to manage your network settings to ensure proper data flow. If you're familiar with programming, there are also libraries available that can help streamline the integration. Good luck!

You can definitely achieve communication between your Siemens S7-1200 and Allen-Bradley ControlLogix PLCs, even though they use different protocols. One effective solution is to implement an OPC server that supports both Ethernet/IP and Profinet, acting as a bridge between the two protocols. You’ll need to configure the OPC server to read the tags from the S7-1200 and then map them for accessibility by the ControlLogix. Make sure to check if the OPC server you're considering supports both platforms, and don't forget to pay attention to any licensing requirements or compatibility issues. Once set up, you'll have a seamless way to access and share data across these two systems!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Can I connect a Siemens Profinet PLC to an Allen-Bradley Ethernet/IP PLC for tag access?

Answer: - Yes, it is possible to establish communication between a Siemens Profinet PLC and an Allen-Bradley Ethernet/IP PLC for accessing tags, even though they operate on different protocols.

FAQ: 2. Is configuring an OPC server a viable option to enable communication between the two controllers?

Answer: - Yes, configuring an OPC server is a common method to facilitate communication between controllers using different protocols like Profinet and Ethernet/IP.

FAQ: 3. What steps can I follow to make the connection between Siemens S7-1200 PLC and Allen-Bradley ControlLogix PLC work?

Answer: - To establish communication between the Siemens S7-1200 PLC and Allen-Bradley ControlLogix PLC, you may need to utilize an OPC server and configure it appropriately to ensure seamless tag access between the two controllers.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →