Cost-Effective Upgrade: Generic SD RAM and CF Card for PanelView Plus Allen Bradley

Question:

I am inquiring about the possibility of upgrading the SD RAM and CF card of a PanelView Plus AB with a generic SD RAM and CF card in order to reduce costs. The Allen Bradley components are priced at $800, while the alternative options are available for only $50. This cost-saving upgrade could be a viable option for many users.

Top Replies

When adding third-party components to the terminal, Rockwell Automation will not provide support. While the RAM module is not proprietary, the BIOS may have limited compatibility. The removable CF card is compatible with any brand, but it is recommended to use "MLC" type cards for a longer write life and higher temperature ratings compared to traditional cards. It is advised to use a card under 32 GB and formatted for FAT16. The internal CF card on older pre-v6 terminals contains various partitions with the operating system and other components. It is possible to duplicate these partitions using a Linux computer and the "dd" command, but using Windows-based disk image duplicator tools have not been tested.

Ken Roach emphasized the capability of duplicating files using a Linux computer and the "dd" command. It is important to understand the responsibility that comes with this power. Mistaking the input and output (if/of) can result in catastrophic consequences, earning the nickname "disk destroyer".

According to Ken Roach, Rockwell Automation will not provide support for the terminal if third-party components are installed. The RAM module is not proprietary, but compatibility may be limited by the BIOS. When choosing a removable CF card, any brand can be used, with a recommendation for "MLC" type cards due to their longer write lives and higher temperature ratings. It is advised to use a card under 32 GB and formatted for FAT16 for optimal performance. Old terminals with internal CF cards formatted with multiple partitions can have their operating systems and components duplicated using a Linux computer and the "dd" command. Windows-based disk image duplicators have not been tested for this purpose. It is possible to substitute an Allen Bradley SD RAM with a similar one from another manufacturer with the same frequency.

If you decide to use aftermarket parts with your Rockwell Automation PanelView Plus, keep in mind that Rockwell Automation may not offer support or troubleshooting assistance. While it's worth a try, there is no guarantee it will function properly or be recognized by the terminal. If your PanelView Plus is over 10 years old and utilizes removable RAM modules along with an internal CF card, it is likely out of warranty. However, it may be worth attempting to use aftermarket parts since there is little risk involved.

The issue at hand is the inadequate storage capacity of the CF card or the need for an upgrade in the SD RAM (with only 64MB of RAM and CF storage).

While it does sound really tempting to cut costs with generic alternatives, it's important to consider the compatibility and potential conflict risks. Allen Bradley designs their components to work optimally and synchronize with their systems. Using non-AB components may lead to unexpected issues or even failure down the line, which could cost you more in repairs and downtime. Conduct a careful risk analysis and seek professional advice before proceeding. It might turn out that the $800 is well worth the security and peace of mind.

While it's quite tempting to go for the cheaper, generic alternatives, you should note that Allen Bradley products are fairly proprietary. The firmware within AB products might not be compatible with non-AB components. Furthermore, using unofficial parts might void your warranty or potentially cause damage, erasing any cost-saving benefits you were expecting. Ensure you thoroughly research compatibility before proceeding with such an upgrade.

While the hardware upgrade you're considering can indeed save costs, there are a few things to keep in mind. One crucial factor is that Allen Bradley designs its components to work best with their own products. Using generic SD RAM and CF cards might technically work, but it could also lead to compatibility issues and potentially unstable performance. Unexpected glitches or data loss can lead to costly downtime. Therefore, while the initial saving could be significant, you might pay for it in the long term with possible maintenance and troubleshooting expenses. As the adage goes, sometimes you get what you pay for, and this might be one of those cases.

While I totally get the appeal of saving costs, I’d caution against using generic SD RAM and CF cards in the PanelView Plus. These systems are often finely tuned to work with specific hardware, and swapping in cheaper components could lead to reliability issues or even compromise your warranty. It might be worth reaching out to Allen Bradley for insight on compatibility or even considering refurbished official parts as a middle ground. Just something to think about before you make the switch!

While saving costs is always appealing, I’d recommend being cautious with non-branded components in such specialized hardware. PanelView Plus systems can be quite finicky with memory and storage compatibility, and using generic SD RAM or CF cards might lead to instability or performance issues down the line. It could be worth checking user reviews or forums for anyone who has successfully used those alternatives before making the switch!

While it’s tempting to go for cheaper generic components, I’d be cautious about compatibility and performance. PanelView Plus systems often have specific requirements, and using non-approved SD RAM and CF cards might lead to stability issues or unexpected errors. It could save you money in the short term, but could end up costing more if it affects the functionality of your system. It might be worth doing some research or reaching out to others who have tried similar upgrades for their insights!

It's definitely tempting to go for the cheaper options, but I’d be cautious about using generic SD RAM and CF cards in a PanelView Plus. Sometimes, these devices have specific requirements or firmware that may not be compatible with non-OEM components, which could lead to reliability issues down the line. It's worth weighing the cost savings against the potential risks of functionality or warranty problems, especially in critical applications. Have you checked if anyone has successfully used third-party components in a similar setup?

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Can I upgrade the SD RAM and CF card of a PanelView Plus Allen Bradley with generic components? - Yes, it is possible to upgrade the SD RAM and CF card of a PanelView Plus Allen Bradley with generic components as a cost-effective alternative to the original Allen Bradley components.

FAQ: 2. What are the cost savings of using generic SD RAM and CF cards compared to Allen Bradley components?

Answer: - The Allen Bradley components are priced at $800, while alternative generic options are available for only $50, resulting in significant cost savings for users.

FAQ: 3. Are there any compatibility issues or risks associated with using generic SD RAM and CF cards in the PanelView Plus AB?

Answer: - While cost-effective, it is important to ensure that the generic SD RAM and CF cards are compatible with the PanelView Plus AB to avoid any potential compatibility issues or risks.

FAQ: 4. How do I perform the upgrade using generic SD RAM and CF cards in the PanelView Plus AB?

Answer: - Detailed instructions on how to perform the upgrade using generic SD RAM and CF cards in the PanelView Plus AB may vary depending on the specific model and requirements. It is recommended to refer to the user manual or seek guidance from a professional technician.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →