Creating I/O Drawings for New Installations: AutoCAD Electrical Issues and SolutionsWithDataDWG File Sharing

Question:

Looking for software to create I/O drawings for new installations? I've been experimenting with AutoCAD Electrical, but I'm encountering issues with downloading it because of a 32-bit MS Office application that needs to be uninstalled. If anyone has AutoCAD Electrical and a DWG file from an AB Complex project to share, I could make manual adjustments in AutoCAD LT. This way, I can avoid using the Excel template and AutoCAD Electrical.

Top Replies

I once utilized ACLT to develop numerous templates for various devices such as PLCs, I/O cards, and motor starters. Unfortunately, the company I was employed at went out of business a few years ago, resulting in the loss of these templates. I will search for them on a USB drive and share them once I locate them, but I am currently away from home and it may take some time.

Presented here is a sketch from my ongoing project, where I employ AutoCAD in conjunction with the CADProfi electrical plugin. While the drawings may not be aesthetically perfect, they are highly functional. The terminals are precisely arranged on a 3/8" grid for optimal alignment.

If you have purchased a license for AutoCAD Electrical, it is important to address any software issues you may encounter. AutoCAD Electrical (ACADE) offers a comprehensive set of features compared to the limited capabilities of AutoCAD LT. In my past experience, working with a limited number of ACADE licenses sometimes required me to receive files from AutoCAD LT users to complete certain commands that were missing in the LT version. While EPLAN is considered to be superior to AutoCAD Electrical, the latter is often more cost-effective. Despite the challenges I have faced in my 11+ years of using AutoCAD Electrical, I appreciate its capabilities compared to basic 2D CAD software.

I have been experimenting with SkyCAD and find it to be user-friendly. Currently, I am utilizing it for simple wiring plans. I am curious if there are any advanced functions or features that this software may not support.

Following Draftsight's decision to no longer offer a free app, I joined the consensus and switched to using NanoCAD. I have successfully utilized NanoCAD for various tasks including creating electrical and mechanical parts, designing machine layouts, and developing process flows.

That's a pretty common issue with AutoCAD Electrical and 32-bit MS Office. I hope you can navigate around that. Alternatively, you can try using the EPlan Electric P8 software. It's a comprehensive solution for creating and documenting automation systems. It's compatible with most file formats including DWG. Unfortunately, I can't help with the AB Complex project file, but I'd recommend posting in the Autodesk forum or a LinkedIn group related to industrial automation. There's a good chance some kind soul might be willing to share their project files.

Have you thought about reaching out to your network or checking on forums where users might share AB Complex DWG files? Sometimes you can find quite a few resources online, especially in engineering communities. Plus, if you're just looking for some I/O drawings, you could also consider alternatives like using schematic drawing software like EPLAN or SmartDraw, which might help streamline your process without dealing with the hiccups of AutoCAD Electrical. Good luck!

Have you considered trying out some alternative software like EPLAN or SolidWorks Electrical? They both have robust features for creating I/O drawings and might be more straightforward if you're running into issues with AutoCAD Electrical. As for the DWG file, I don't have one on hand, but it might be worth checking community forums or specific groups focused on Allen-Bradley projects—there might be someone willing to share resources. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What software can be used to create I/O drawings for new installations?

Answer: Answer: AutoCAD Electrical is a popular software for creating I/O drawings for new installations.

FAQ: 2. What issues might be encountered when downloading AutoCAD Electrical?

Answer: Answer: Users may encounter issues downloading AutoCAD Electrical if there is a 32-bit MS Office application that needs to be uninstalled.

FAQ: 3. How can AutoCAD Electrical users share DWG files for AB Complex projects?

Answer: Answer: AutoCAD Electrical users can share DWG files for AB Complex projects to facilitate collaboration and manual adjustments in AutoCAD LT.

FAQ: 4. Is it possible to avoid using Excel templates and AutoCAD Electrical for making adjustments to I/O drawings?

Answer: Answer: Yes, users can avoid using Excel templates and AutoCAD Electrical by making manual adjustments in AutoCAD LT when working with shared DWG files from an AB Complex project.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →