I want to express my gratitude to Sigmadelta for the offer, but I have already resolved the issue. Utilizing an old laptop in XP compatibility mode, I was able to successfully execute the program as promised. There were no suspicious activities detected, but one can never be too cautious. The gathered information, especially the pointer array and messages, will be invaluable for revitalizing the software on a contemporary interface. It appears that the program only supports OP7 psr files. I extend my heartfelt thanks to Schtiel for providing me with this valuable tool, as well as to the original creator. It would be fantastic if a modern version of the program could be developed. Warm regards, Andy.
If possible, could you please send me the requested tool as soon as possible? I have an urgent need for it. You can reach me via email at [email protected] Thank you in advance for your assistance.
- 03-08-2024
- ahmed iraqi 87
Schtiel noted that the tool is encrypted with a packer, which may trigger antivirus warnings. Therefore, it is recommended to proceed with caution when using it. Would it be possible for you to provide a copy of this program? Thank you in advance for your assistance. - Segaauto.
@Sigmadelta, thank you for the offer, but I have already resolved the issue. I was able to successfully run it on an older laptop in XP compatibility mode, and it performed as promised without any suspicious activity. I now have more information to update the software for a modern panel, with the most valuable resources being the pointer array and messages. It appears that the tool can only function with OP7 psr files. Thank you, Schtiel, for providing me with this helpful program. A big thank you to the creator as well! It would be great to see a modern version developed. Best regards, Andy.
Could you kindly send me this tool? I have a backup of an OP7 panel and would like to migrate it to a new panel. My email address is: [email protected] Thank you.
I need to search for it as I am not certain about its location. I will confirm tomorrow.
If you've been eagerly awaiting a response to your messages since the start of the year, I apologize for the delay. I haven't been checking the forum regularly while logged in, so I may have missed some private messages. Thank you for your patience.
Hello, Andepand. I kindly request for you to send me the software at [email protected] Thank you.
Philosofy inquired with Andepand about obtaining the software via email, requesting a download link. Andy responded that Gmail does not accept .exe files and provided a solution. Cheers!
Hello friends, I am in need of a copy. Please email it to me at [email protected] Thank you!
Hello Andepand, could you kindly upload the file again? Thank you!
I have reached out to the website administrator to see if I can add it to the download section. If not, I will send it to you via email. The challenge is that I have to constantly upload it to a file transfer platform whenever someone requests it. Email services often flag the file as risky due to its .exe format.
Hey Andepand, I reached out to you via direct message but haven't heard back yet. Could you please respond to my message? Thank you!
I have not received any communication from the website administrator regarding the program I sent via email. Thank you. Regards, Andy.
Hello Andepand, could you kindly provide me with the download link to my email address at [email protected]? I appreciate your assistance in advance. Thank you.
Greetings Andepand, I would greatly appreciate it if you could email me the download link at [email protected] Thank you in advance for your assistance.
Hey @andepand, I've sent you a private message. Could you kindly provide me with the download link for the tool? Thank you very much.
Kindly use a Hotmail or Outlook email address as Gmail restricts the sending of the file even with the file extension modified.
Andepand requested a Hotmail or Outlook email address because Gmail was not allowing the file to be sent, even after changing the extension. I have sent you a message with an alternative Hotmail address.
I have sent it to you. With many individuals requesting the program, it would be beneficial if you could share your expertise on its usage here. I personally haven't utilized it in quite some time.
Andepand mentioned sending the program to others and suggested sharing experiences on how to use it. It would be helpful if you could provide a download link, as many people are interested in the program. If you still have it available, I would greatly appreciate it if you could send me a link. I haven't used the program in years and I have an issue with an old OP7. Thank you!
Exiled inquired: "Hey Andy, is the download still accessible? I would greatly appreciate a link. I'm experiencing problems with an old OP7. Regards." You should find it in your email. Best of luck.
Please send the software as soon as possible. Andy previously mentioned that it should be in your mailbox. Good luck with it! Hello Andy, Felipe here. Could you resend the tool to me? I seem to have misplaced the email from last year and would greatly appreciate your help in sending it again. Thank you.
I need a Hotmail email address as Gmail is currently not accepting the attachment, despite changing its extension.
andepand inquired: Could you please provide me with a Hotmail address? Gmail does not seem to accept the attachment, even after changing its extension. Click here to read a post on another forum that includes a download link for the tool. I successfully downloaded it from http://plcforum.u z.u a/viewtopic.php?f=4&t=8598&p=19946&hilit=Prosave#p19946 (remove spaces when copying the link). Just a heads up, make sure to run it on a Windows XP system for it to work properly.
How to use decoderandepand mentioned: Please provide me with a Hotmail address as Gmail seems to be rejecting attachments, even when the file extension is changed. Have you ever utilized this tool for an upgrade? I have obtained the results from the decoder (which I have included), but I am unsure about certain memories that don't seem to exist on the PLC, such as "plc2 M1.21". However, memories like "plc1 DB50.DBW100" can be located in the program. In conclusion, I am slightly confused by the results and would appreciate input from someone experienced in this area.
Hey everyone, I'm in need of a copy of Decoder Prosave. I found it really helpful in the past but unfortunately, I've misplaced my copy. If anyone can assist, please contact me at [email protected] Thanks!
Greetings! I am in need of Decoder ProSave as well. If anyone has it, please send it to me at [email protected] I have utilized this tool previously, however, I seem to have misplaced it. Thank you in advance for your assistance.
Please share your Prosave backup file with me for analysis. Unfortunately, emailing the file is not an option due to email services flagging it as a virus.
Alcastro inquired about obtaining Decoder Prosave. If anyone can send it to [email protected], that would be greatly appreciated. I have utilized this tool before, but unfortunately, I have misplaced it. Thank you in advance. Also, [email protected], please review your email as I have already forwarded the file to you.
Sigmadelta has requested: Please share your Prosave backup file with me. Due to virus detection by email services, sending via email is not feasible. Do you have a Hotmail account I can use to send you the file?
Philosophy inquired: Have you ever utilized this tool for an upgrade before? I have the output from the decoder, including some memories such as "plc1 DB50.DBW100" that I can locate in the program. However, there are others like "plc2 M1.21" that I am unsure about. I am a bit puzzled by the results and would appreciate input from those experienced in this area. Share your expertise as I am unable to find any "db" references in the PLC project, and a more knowledgeable perspective would be immensely helpful to both of us.
I have made some progress, but there is still more work to be done. I will keep you updated on my progress with migrating the panel.
andepand mentioned that he had sent a download link, but Gmail does not allow .exe files to be received. Please provide me with the tool as well. I am grateful for your assistance. You can send it to me at [email protected] Thank you.
Andepand mentioned that Gmail does not accept .exe files, so I have sent you a download link instead. Cheers, Andy. Hi there, could you kindly provide me with the download link for the decoder prosave tool? I am in urgent need of it and would greatly appreciate your assistance. Thank you in advance. Best regards.
"Andepand mentioned that he has sent a download link, but Gmail does not allow .exe files to be downloaded. Can I please receive the download link for the Decoder Prosave tool at [email protected]? Your assistance is greatly appreciated. Regards, [Your Name]"