Display loaded application name on HMI screen in FactoryTalk View Studio ME

Question:

I am currently utilizing FactoryTalk View Studio ME to develop a custom application for an Allen-Bradley PanelView Plus7. My goal is to showcase the loaded application name (found under Terminal Settings/Startup Options/Application Name) on one of the HMI screens. Can anyone confirm if this functionality is achievable on this platform?

Top Replies

It may have been some time, but I'm confident that you can extract the screen number from the panelview and transfer it to the PLC. By utilizing this number, you can easily incorporate a predefined string into the tag used for the panelview.

However, the appellation of the application is a different issue altogether. The original poster is inquiring about the name of the currently active application, not the screen itself. Unless I am mistaken. In a forum post, user iammonkie mentioned their attempt to showcase the application name loaded in Terminal Settings/Startup Options on one of the HMI screens. I am unaware of any method to exhibit the loaded application name or save it to a tag for display purposes. OG.

Operaghost mentioned that the application name is a separate issue from the screen name that the OP is seeking. It is unclear how to display the name of the loaded application or save it for future display. Ah yes, I misunderstood earlier. I don't think there is a method to achieve that, OP.

Rockwell offers ActiveX controls for network and terminal information. You can access these controls by visiting their platform. The available information is limited to the DeviceName. However, you can potentially utilize this data, along with part of the IP address, in conjunction with a multi-state control to reach your desired outcome. Remember to continually monitor your progress and make adjustments as needed for optimal results.

Cheeseface mentioned that Rockwell offers ActiveX controls for network and terminal information. You can access these controls from the following link: https://imgur.com/a/fsfBQeb. While the controls only display the DeviceName, you may be able to utilize this information along with the IP address in a multi-state control to reach your desired outcome. The DeviceName specifically refers to the name assigned to the Ethernet interface, rather than the application name. After reviewing this ActiveX control and others, it seems that none provide access to the loaded application name.

Yes, it's possible to display the application name on a screen. You can use FactoryTalk's system tag, _AppTitle. This is a pre-defined string which contains the title of the current running application. Just create a new display, add a string display object, and enter _AppTitle as the tag for that object. Don't forget to place a navigation button on your main screen to this new display which shows the current running application name.

I have some experience with FactoryTalk View Studio ME and yes, it's possible to display the application name on your HMI screens. The system-defined tag "_StartupApplication" holds the name of the currently loaded application. You can then create a string display object on your screen to showcase this tag. Hope this helps!

Indeed, it's possible to display the application name on your HMI screen. However, it's not as straightforward as you might hope. You'll need to create a string tag in your PLC program and write the AppName into that tag. Then, bind a string display object in FactoryTalk to that tag. This way, you can make it visible on your screen whenever you want. It might be a roundabout method, but it works!

Yes, your goal is achievable using FactoryTalk View Studio. You're on the right track by going into Terminal Settings/Startup Options. Here's a tip - utilize tag placeholders in text objects. Create a multistate indicator that reads the startup application tag and returns the name as a string. Then link this string to the text object on your HMI screen. If everything is set properly, it will display the current application name. Experiment with it, and you'll get the hang of it.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Can I display the loaded application name on an HMI screen in FactoryTalk View Studio ME?

Answer: - Yes, you can display the loaded application name on an HMI screen in FactoryTalk View Studio ME. This can be achieved by accessing the Terminal Settings/Startup Options/Application Name parameter.

FAQ: 2. How can I showcase the loaded application name on the HMI screen in FactoryTalk View Studio ME?

Answer: - To display the loaded application name on the HMI screen, you need to access the Terminal Settings/Startup Options/Application Name setting within FactoryTalk View Studio ME and incorporate it into your HMI screen design.

FAQ: 3. Is it possible to customize the display of the loaded application name on the HMI screen in FactoryTalk View Studio ME?

Answer: - Yes, you can customize the display of the loaded application name on the HMI screen in FactoryTalk View Studio ME by incorporating it into your HMI screen design using appropriate text or graphic elements.

FAQ: 4. Will the displayed application name update automatically if changed in the Terminal Settings/Startup Options in FactoryTalk View Studio ME?

Answer: - Yes, if the loaded application name is changed in the Terminal Settings/Startup Options, the displayed application name on the HMI screen will update automatically in FactoryTalk View Studio ME.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →