Does Schneider Control Expert V15.0 Support Dual Monitor Setups on Windows 11?

Question:

Hello, I am using Control Expert V15.0 on my Windows 11 computer with two monitors and I was wondering if it supports dual monitor setups. I am trying to display the operator screen on one monitor and the PLC code on the other, but I am unable to drag the operator screen to the second monitor. Is there a solution to this issue? Thank you.

Top Replies

I typically divide my screen, unaware that it could be detached. This feature is sometimes overlooked but can greatly enhance multitasking capabilities.

Hey there! Yes, Control Expert should support a dual monitor setup. It could be that your windows aren't set to "Undocked". When they're docked, you can't drag them to the other screen. If you undock the windows, you should be able to freely move them between the screens. You can undock a window by right-clicking on the tab and selecting "Undock." Give that a try and let us know how it goes!

Certainly, Control Expert should indeed support dual monitor setups. It sounds like the issue could be related to your Windows display settings rather than the program itself. Have you validated that your operating system is correctly identifying and utilizing your second monitor? You might need to check your display settings and ensure that the "Extend these displays" option is selected. Additionally, try updating your graphics drivers. If the problem persists, reinstalling Control Expert might help as well.

Hey, from what I understand, Control Expert V15.0 does support dual-monitor setups. However, you might be encountering issues due to some technicalities. One thing you could try is to check your display settings, ensure both monitors are correctly recognized and set up extended display. If the problem persists, you may want to consider reaching out to Schneider Electric's customer support or their user community for more specialized guidance. They should be able to help you solve your issue swiftly.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Does Schneider Control Expert V15.0 support dual monitor setups on Windows 11? - Yes, Schneider Control Expert V15.0 does support dual monitor setups on Windows 11. 2. How can I display the operator screen on one monitor and the PLC code on the other in Control Expert V15.0? - While using Control Expert V15.0, you can drag the operator screen to the second monitor by adjusting the display settings in the software.

FAQ: 3. I am facing issues dragging the operator screen to the second monitor in Control Expert V15.0, what should I do?

Answer: - If you are unable to drag the operator screen to the second monitor in Control Expert V15.0, you may need to check your display settings and ensure that both monitors are recognized by the software.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →