Does WinCC V8.0 software include both RT and RC capabilities?

Question:

Hello brother, I hope this message finds you well. I am currently working on a project that involves the utilization of SCADAWinCC system software V8.0, RC 2048 (2048 PowerTags)Part No.: 6AV6381-2BP08-0AX0SIEMENS. I am wondering if this software is sufficient to generate a RUNTIME (RT) on the same computer, or if a separate RT license is required. Your prompt response is greatly appreciated. Thank you.

Top Replies

"RC" stands for "runtime and configuration," allowing you to operate a runtime on the same computer based on the number of tags permitted by your license. This enables seamless integration and efficient management of your system.

According to JesperMP, "RC" stands for runtime and configuration. This means you can run a runtime on the same computer with the licensed number of tags. Feel free to click to learn more. Thank you for your response.

Hey there! The SCADA WinCC V8.0 should indeed be able to generate RUNTIME (RT) on the same computer, provided that the concerned machine meets necessary specifications for the smooth running of the software. However, it does not include a separate RT license. The base software can support an RT environment, but you would still need to purchase a license for the runtime separately. Hope that clears things up!

Hello! Your project sounds intriguing. Yes, you can indeed generate a RUNTIME (RT) with SCADA WinCC V8.0 on the same computer. This software actually includes the runtime license. However, make sure your computer's hardware and operating system meet the software's requirements for smooth operation. If you're handling large volumes of data or complex operations, it's worthy investing in an optimal system to support it. Best of luck with your project!

Hello there! When it comes to SCADA WinCC software V8.0 in particular, you can indeed generate a RUNTIME on the same computer, and the RC 2048 license should cover that. However, bear in mind that performance may depend on the specifications of your machine and the complexity of your project. If your project is considerably large, consider getting a separate RT license for optimum performance. Again, while not mandatory, it's sometimes encouraged. I'd suggest reaching out to your local Siemens support for the best advice specific to your scenario. Good luck with your project!

Hey! Generally, SCADA WinCC V8.0 does require a separate RUNTIME license to fully utilize its capabilities on the same machine. While you can set up and configure your project without an extra license, running it in real-time would typically need that additional RUNTIME license. It’s best to check Siemens' official documentation or customer support for specifics related to your project setup to avoid any surprises. Good luck with your project!

Hey there! The SCADA WinCC system you’re using is pretty robust, and generally, it allows for a fair bit of functionality without needing an additional Runtime license on the same machine. However, it’s always a good idea to double-check the specific licensing agreements, as the details can vary based on the setup or any updates from Siemens. If in doubt, reaching out to Siemens' support can give you the clarity you need. Good luck with your project!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Does WinCC V8.0 software include both RT and RC capabilities?

Answer: - No, WinCC V8.0 software does not include both RT and RC capabilities by default. Additional licenses may be required for Runtime (RT) functionality.

FAQ: 2. Is a separate RT license necessary to generate a RUNTIME (RT) using WinCC V8.0 software?

Answer: - Yes, a separate RT license may be required to generate a Runtime (RT) using WinCC V8.0 software. It is recommended to check with Siemens or the software provider for specific licensing requirements.

FAQ: 3. What is the difference between RT and RC capabilities in WinCC V8.0 software?

Answer: - Runtime (RT) refers to the ability to run and execute the SCADA system in real-time, while Runtime Configuration (RC) typically involves configuring and setting up the system. Separate licenses or permissions may be needed for each functionality.

FAQ: 4. Where can I obtain the necessary RT license for WinCC V8.0 software?

Answer: - To obtain the necessary RT license for WinCC V8.0 software, it is advisable to contact Siemens or an authorized software vendor for licensing details and procurement.

FAQ: 5. Are there any limitations on the number of PowerTags supported by WinCC V8.0 software?

Answer: - The WinCC V8.0 software with RC 2048 (2048 PowerTags) may have