Download GX Works Software Without Product Code Needed

Question:

As a beginner in PLC programming, I recently acquired a FX3U-14MR Mitsubishi Clone. To program it, I understand that I need to utilize GX Works Software. However, I have encountered challenges in finding a compatible version that will successfully install on my PC. Despite attempting to download from the authorized Mitsubishi site, the installation requires a Product Code, which I do not possess. Strangely, I have noticed that other users have managed to program their FX3Us using GX Works without this issue. If you could provide a link to a downloadable version of GX Works that does not necessitate a product code, it would be greatly appreciated.

Top Replies

This is a paid product available from mitsuMitsu. Contact your local distributor for more information. mitsuMitsu previously offered a 30-day trial version, although it is unclear if this promotion is still available.

I totally understand where you're coming from, as I experienced a similar problem when I first started. Unfortunately, legitimate versions of GX Works require a Product Code during the installation. It's a part of Mitsubishi's policy to prevent software piracy. I'd suggest acquiring the version that fits your PLC from a verified Mitsubishi distributor to ensure it comes with the necessary product code. However, you might also want to reconsider your IDE choice, taking into consideration other programming software like CODESYS or Automation Direct, which are more beginner-friendly and often less restrictive. Remember, the most important thing is to start programming and gain hands-on experience.

It can indeed be a little tricky when starting out with PLC programming. I've encountered similar challenges with a different brand, so I can relate to your predicament. It is often the case that some versions of software like GX Works do require a product code, which typically comes when you buy the software. As an ethical and legal consideration, I would discourage seeking a downloadable version that doesn't require a code as such software could potentially be a cracked version and infringe copyright laws. Essentially, you either need to find a reseller who can provide you with a product code or contact Mitsubishi directly, explaining your situation - they might be able to assist you or direct you to the appropriate channels. Be sure to always use legitimate means to acquire software to avoid legal issues and also shield your PC from potential malware threats.

You're right, the FX3U-14MR clone should be compatible with GX Works2 or GX Developer. As for the product code, it sounds like you might be trying to install a version of the software intended for commercial use, which is likely why it's asking for that code. Many beginners start with a trial or free version of the software, which can be easier to find and install. I'd recommend reaching out to the Mitsubishi customer service - they should be able to provide a link or directions to download a trial version and offer any additional installation support you may need. Hope this helps!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Can I program my FX3U PLC without a Product Code using GX Works Software?

Answer: - Yes, some users have reported success in programming their FX3U PLCs with GX Works Software without the need for a Product Code.

FAQ: 2. Where can I find a downloadable version of GX Works Software that does not require a Product Code?

Answer: - While it is recommended to obtain the software from authorized sources, some online resources might offer versions of GX Works that do not necessitate a Product Code. However, be cautious of the legitimacy and potential risks associated with downloading software from unofficial sources.

FAQ: 3. Are there alternative programming software options available for my FX3U PLC?

Answer: - Yes, there are alternative programming software options available for programming Mitsubishi PLCs, such as GX Developer or other third-party software solutions that may be compatible with the FX3U series.

FAQ: 4. How can I resolve installation challenges when installing GX Works Software?

Answer: - If you are facing challenges during installation, ensure that you are using a compatible version of the software with your operating system and that all system requirements are met. Additionally, reaching out to Mitsubishi technical support or seeking assistance from online forums dedicated to PLC programming may provide solutions to installation issues.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →