Efficient Communication with Mitsubishi E800 Inverter: Extracting Data from FR Configurator 2 Batch Monitor via Modbus Registers.

Question:

I am currently developing a software program for PC that interfaces with a Mitsubishi E800 inverter using Modbus over Ethernet (Modbus/TCP) for efficient communication. The FR Configurator 2 software, which is utilized to configure the inverter, includes a batch monitor function with 58 different selectable readings for monitoring and display. These readings are precisely the data points I aim to extract in my PC software. However, it is unclear how these readings are calculated within the software. Ideally, I am looking for a consecutive bank of Modbus holding registers that can be easily accessed in one read operation. Despite reviewing the Modbus register documentation, I have not come across a simple solution like "Output frequency" as seen in the FR Configurator 2 software. It seems that the registers store more complex data, lacking straightforward readings like the one mentioned.

Top Replies

If my memory serves me correctly, the PR numbers range from PR0-999, corresponding to registers 41000 to 41999. I am unsure which registers are for reading or read/write functions. I came across a manual for the Mitsubishi Electric FR-E800 that seems to be more reliable than the one on the Mitsubishi website, which appears to be corrupted with missing data. The FR-E800 instruction manual for communication can be viewed and downloaded here. Additionally, a slightly improved version of the manual can be found at the following link: https://eu-assets.contentstack.com/v3/assets/blt5412ff9af9aef77f/blt0b885f651034bc7e/6172b5b657efba120b414818/c982ca47-18ee-11eb-901c-b8ca3a62a094_ib0600871engd.pdf

Hello, thank you for your response. Apologies for the confusion earlier. I am actually referring to a Mitsubishi A840 inverter. I received assistance from a Mitsubishi representative, but even with the manual, I struggled to locate the section detailing the registers I needed. However, it can be found on page 447 of the "FR-A800 instruction manual (detailed)". There is a set of 58 registers starting at address 40201 in the holding registers. This information was helpful and resolved my issue. Thank you for your assistance.

It sounds like you're doing some pretty exciting work! One thing that may help is taking into consideration how Modbus protocol works. Yes, usually the register documentation should be your key to unpacking what each register contains. However, sometimes, variables like "Output frequency" may not be recorded in one single register. They may actually be calculated on-the-fly from a combination of different registers. I would suggest you observe the transactions while FR Configurator 2 is running and use a Modbus tester/sniffer to understand how the values are being calculated. It might not be as straightforward as direct reading from the register, but a blend of read operations, calculations, or even conditional statements. It might require a bit more leg work and exploration on your end, but it should help get you on the right track.

It sounds like you're on an interesting project! It's not always straightforward to exactly mirror what sophisticated software like FR Configurator 2 is doing, especially with dozens of different readings at hands. Sometimes, these readings are computed data rather than directly retrieved. My suggestion would be to determine the most critical datapoints you're after and focus on those individually. It's possible that composite values like 'Output Frequency' are calculated from multiple registers and not retrieved directly as a single value. Check if any solutions or libraries that handle Modbus/TCP support the operations you're trying to perform. If all else fails, Mitsubishi tech support may be able to provide some assistance, given you're interfacing with their hardware. It might take some digging, but I'm confident you'll get there. Keep going!

I've run into similar issues with Modbus communication in the past. The documentation isn't always straightforward, and registers sometimes store higher-level, non-specific data, abstracting away useful base-level readings like 'output frequency.' My guess is that the FR Configurator 2 software is interpreting or processing these complex data values to display in a more user-friendly way. One solution might be to first determine the algorithm FR Configurator 2 is using to parse this raw data into the specific values you wish to extract. This may require a bit of reverse engineering, or reaching out to Mitsubishi for some insight if possible. Hope this helps a bit and good luck with your project!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I extract specific data points from a Mitsubishi E800 inverter using Modbus over Ethernet?

Answer: Answer: To extract specific data points from the inverter, you can utilize Modbus over Ethernet (Modbus/TCP) communication protocol. You can refer to the FR Configurator 2 software's batch monitor function, which offers 58 different selectable readings for monitoring and display.

FAQ: 2. Are there consecutive Modbus holding registers that can be easily accessed to retrieve the desired data points from the inverter?

Answer: Answer: While reviewing the Modbus register documentation, it may not be straightforward to find a consecutive bank of registers that directly correspond to the data points displayed in the FR Configurator 2 software. The data stored in the registers might be more complex and not as simple as the readings provided in the software.

FAQ: 3. How can I access detailed information such as "Output frequency" from the inverter through Modbus registers?

Answer: Answer: Extracting detailed information like "Output frequency" from the inverter using Modbus registers may require understanding the specific register mappings and data structures used by the inverter. It is essential to explore the documentation provided by Mitsubishi for the Modbus communication setup and data interpretation.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →