Fixing RSlinxng.exe Error on PV Plus 6 700 Firmware Version 5.10.16.09

Question:

Hello, I am currently experiencing a RSlinxng.exe error on my PV plus 6 700 with firmware version 5.10.16.09. It seems to be the latest version compatible with this hardware. Unfortunately, when attempting to browse the linx enterprise configuration, nothing is displaying. I am wondering if there is a solution to this issue as I would like to repurpose this HMI. Thank you, Scott.

Top Replies

When you search on Google for "RSlinxng.exe error", you will find numerous solutions and resources to help resolve this issue.

I successfully resolved the issue using Tech note 1084309 that was recently sent to me. Grateful for the fix!

After resolving the postwar issue, I received Tech note 1084309 which provided the solution. Can you also send me the copy of Tech note 1084309 as I am experiencing the same problem? Thank you!

Alanhuro requested to receive tech note 1084309 due to experiencing a similar issue. For more information, you can visit the link provided: https://rockwellautomation.custhelp.com/app/answers/answer_view/a_id/1084309.

Hi Scott, it sounds like you're dealing with a tricky issue here. I've encountered similar problems with RSlinxng.exe before. To start with, make sure your PV plus 6 700 and the system you're browsing from are on the same subnet. Sometimes issues like these are simply caused by network configuration errors. If that doesn't rectify the situation, you might try a factory reset on your HMI device. Do ensure you've backed up your data, as this method will erase any current configurations. Updating the RSLinx Enterprise software to the latest version compatible with your system might also help. Let us know how things work out.

Hey Scott, I also encountered a similar issue a while back. The problem might not be with the firmware version, but rather it could be a compatibility issue between the RSlinx enterprise version and the version of FactoryTalk used. Ensure both are compatible. If that doesn't work, I'd suggest trying a factory reset on the PV Plus 6 and then carefully reinstall the correct versions of the software. It worked for me - hope this helps!

Hey Scott, it might be worth attempting a complete uninstallation and reinstallation of the RSlinx software to remedy the issue. You could also consider upgrading your firmware version, even though I understand you're on the latest version compatible with your current hardware. If this isn't an option, perhaps consider contacting Rockwell Automation's support, as they've been quite helpful in my experiences. Just make sure your license of RSlinx version is Professional or Enterprise Edition since the Lite and OEM versions don't support browsing remote networks. Hope this points you in the right direction!

Hey Scott, I experienced a similar issue with RSlinxng.exe error on my PV before. What worked for me was to clear the IP address, flash it with new firmware, and set it to DHCP. After these steps, I was able to browse the linx enterprise configuration. Just ensure that your hardware is compatible with the firmware version you're installing. Hope this helps you out.

Hi Scott! It sounds frustrating dealing with that RSlinxng.exe error, especially when you're looking to repurpose your HMI. Have you tried reinstalling the RSlinx software or checking the server settings to ensure everything is configured correctly? Sometimes, ensuring that the proper drivers are installed and that your firewall settings aren’t blocking communication can help. It might also be worth checking Rockwell's support forums or documentation for any patches or updates specific to your firmware version. Good luck!

Hi Scott! I’ve run into similar issues with RSlinx in the past. One thing that might help is to check your network settings; sometimes, a simple IP conflict can cause issues with the HMI browsing. Additionally, ensure that you have the proper drivers installed for your PV Plus—updating or reinstalling them could resolve the display problem. If you haven’t already, try rebooting both the HMI and your PC to see if that clears up any lingering issues. Good luck with repurposing your HMI!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Q: What does the RSlinxng.exe error on PV Plus 6 700 with firmware version 5.10.16.09 indicate? The RSlinxng.exe error indicates a problem with the Linx Enterprise configuration where nothing is displaying on the HMI.

FAQ: 2. Is firmware version 5.10.16.09 the latest version compatible with PV Plus 6 700?

Answer: Yes, firmware version 5.10.16.09 seems to be the latest version compatible with the PV Plus 6 700 hardware.

FAQ: 3. How can I resolve the RSlinxng.exe error on my PV Plus 6 700 HMI?

Answer: To resolve the RSlinxng.exe error and the issue with Linx Enterprise configuration not displaying, further troubleshooting steps may be required.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →