Guide for Migrating an RSLogix 5000 v20 Project to Logix Designer using a 5380 Controller

Question:

We are currently working on a v20 project utilizing a 1769-L32E controller and are looking to migrate it to a 5380 controller (5069-L320ER) which requires v28 software or later. I have access to v35 software, but as someone new to Logix Designer, I am facing challenges during the conversion process. When attempting to open the v20 project in Logix Designer, it automatically opens in RSLogix 5000. Can anyone provide guidance on this issue?

Top Replies

Upon posting, I quickly tested changing the controller in RSLogix 5000 and was pleasantly surprised to find the 5069-L320ER as an available option, along with the ability to select v35 firmware. I successfully converted the project and now have it open with the 5069-L320ER controller in v35 of Logix Designer. Next step is to add IO modules and resolve any conversion errors (reportedly 82).

Certainly! The project is automatically opening in RSLogix 5000 because that's the software it was originally created in. To open it in Studio 5000 (Logix Designer), you will need to import the project, not just simply open it. Then when you import, you can choose to import to a version compatible with your 5380 controller, i.e v35. Just make sure to back up your project before you begin the conversion, as unforeseen issues may occur. Additionally, the 5380 controller may have some features or capabilities not present in the 1769-L32E, so you may need to adjust your code accordingly.

Hi there, it seems you're facing a common hurdle when it comes to PLC migration. When you're attempting to open the v20 project, it's defaulting to RSLogix 5000 because that's the software affiliated with the v20. Logix Designer, on the other hand, is the rebranded name of RSLogix 5000 from version 21 and later. To solve your issue, you need to update your project files in steps. Open your v20 project in RSLogix 5000 and save as v20.03. Next, open that saved project in Studio 5000 v21 and save it as v21. Repeat this step-by-step upgrade until you reach your target firmware version, which in your case is v28 or later. This may seem quite a task but it's a proven method in handling project migrations. Good luck!

You're right on track! Upgrading Logix systems can definitely feel a bit daunting initially, particularly with significant version jumps. When you're trying to open a v20 project in Studio 5000 (v28 or later), it will automatically default to RSLogix 5000 due to its legacy support for older versions. One workaround is to create a new project in v35 and manually migrate the program content. A neat trick could be exporting your routines from the v20 and importing them into the v35 one by one. However, always remember to be careful with the I/O mapping, as the 5380 behaves differently than the 1769-L32E. With a bit of time and patience, you'll manage this transition. Happy to help further if needed!

It sounds like you're dealing with a common issue when transitioning from older 5000 Series software to the newer 5000 series in Logix Designer. Essentially, you need to open your v20 project in Studio 5000 v21 or later before you can convert to v35. With v21 onwards, the software was renamed Studio 5000 Logix Designer, but it'll still handle the older RSLogix 5000 files. Open your project in v21 (or any version up to v35 that you can access), save it, then open the saved project in v35. After that, converting your controller from 1769-L32E to 5069-L320ER should proceed more smoothly.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. How can I migrate an RSLogix 5000 v20 project to Logix Designer for a 5380 controller? - To migrate an RSLogix 5000 v20 project to Logix Designer for a 5380 controller, you will need to use the Logix Designer software version 28 or later. Ensure you have the correct software version for the migration process.

FAQ: 2. I have Logix Designer v35 software but facing challenges opening a v20 project. What should I do?

Answer: - If you are facing challenges opening a v20 project in Logix Designer using v35 software, try checking the project compatibility settings. Adjust the compatibility settings to ensure the project is opened correctly in Logix Designer.

FAQ: 3. Why does my v20 project automatically open in RSLogix 5000 instead of Logix Designer?

Answer: - If your v20 project is opening in RSLogix 5000 instead of Logix Designer, it could be due to default settings. To resolve this issue, you may need to adjust the file association settings on your computer to ensure v20 projects open in Logix Designer for the migration process.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →