HMI-CAB-C49 Cable for QuickPanel Programming: Compatibility and Variants Explained

Question:

In search of a programming cable to facilitate the download of a pre-existing Quick Panel application for the QPK-2D200-L2P-E Monochrome 6" LCD 24V hardware. According to the manual, the necessary cable for the connection is the HMI-CAB-C49. However, there are multiple variants of this cable, some labeled with a trailing letter (-H or -J) and some without. It is presumed that the letter indicates different versions, with -H possibly being older than -J. The lack of a trailing letter's significance remains unclear. Compatibility information between the hardware and cable versions is scarce, especially since the absorption of the Total Control Product line. Any insights on this matter would be greatly valued, as familiarity with this product line is limited. Thank you for any assistance provided.

Top Replies

This is the direct match part number from Proface: GPW-CB02.

When it comes to legacy software and compatibility with cables, it's important to ensure that the cable you are using has been thoroughly tested. For example, the GPW-CB02 cable may not be compatible with QuickDesigner software, as indicated in its listing. However, an alternative option to consider is the USB-GPW-CB03 cable, which has been improved to work with both GE QuickPanel (Proficy ME & QuickDesigner) and Proface GP ProPB. Tested with GE QuickPanel QPI3D200E2P-B QPJ2D100L2P-A, this cable has received positive feedback from users who found it to be the easiest and quickest option for their QuickPanel devices. It seamlessly integrated with Proficy Machine Edition 9.00 on Windows 7 Pro 64-bit and PME 7.50 on a Virtual Windows XP setup. If you're in need of a reliable cable for your QuickPanel devices, the USB-GPW-CB03 cable may be the ideal solution based on its performance and compatibility with various software versions. Do you have any personal experiences to share with similar hardware and cables? Your insights would be greatly appreciated.

However, Proface confirms that the QuickDesigner download for the QPK-xTDx-0000 panels can be found using the link GPW-CB02: http://www.profaceamerica.com/sites...679607bc14927f00/qpk_xtdx_0000__ds_052009.pdf. I have personally used both GPW-CB02 and GPW-CB03 with QuickPanels, along with QuickDesigner V3.7 (available in Proface and GE Editions) on Windows XP without any issues. Proface originally manufactured QuickPanels for Total Control Products, and production continued after GE acquired TCP.

marty911 pointed out that the functionality of the cable GPW-CB02 has not been fully tested, as indicated in the disclaimer within its listing. However, there have been positive experiences with the USB CB03a cable, which has proven to be compatible with a variety of software and HMI's. You can find more information and purchase the USB CB03a cable with confidence, as it comes with a 60-day money-back guarantee and lifetime replacement policy in case of any issues. For testing results and more details, check out the link provided by Russ here: http://www.plctalk.net/qanda/showthread.php?t=96477.

Dear Sirs, I want to express my gratitude for all the assistance provided in navigating through the process of integrating obsolete product lines into newer ones. Without the support of like-minded enthusiasts, this task can be quite daunting. The CB03 component has been successfully ordered and is expected to arrive next week. Upon its reception, I will provide an update with detailed information regarding the software and hardware utilized. Thank you once more for your invaluable assistance.

I actually dealt with a similar situation a while back for one of my clients. From my experience, the trailing letters on the HMI-CAB-C49 do seem to denote different production runs or minor revisions but all were essentially backwards compatible. I used -J on the same model (QPK-2D200-L2P-E) you're working on without a hitch. However, I'd recommend contacting the manufacturer directly, as they can easily provide specifics and confirm this information. They often have technical support specialists who can help navigate issues like these, even with older product lines. You might need some patience though - depending on their support structure the response could be slow. Best of luck with your project!

I can totally relate to the confusion with those cable variants! I’ve had similar issues in the past with matching cables to specific hardware. From what I've gathered, the trailing letters do generally indicate different revisions or compatibility with specific firmware versions, but it can vary between manufacturers. For the QPK-2D200, it’s best to reach out directly to the manufacturer or check their forums for specific feedback; sometimes there are updates or user experiences that can clarify these details. Additionally, if you have access to any technical support channels, they might help decipher which cable version should work best for your application. Good luck!

It sounds like you're navigating a bit of a maze with those cables! From what I've gathered, the trailing letters usually denote minor revisions or improvements in the cable, but they typically remain compatible with the same hardware, especially when it comes to a specific model like yours. I’d recommend checking in with the manufacturer or a knowledgeable distributor for confirmation; they could provide clarity on which version would work best for your setup. Additionally, looking through forums or community posts for others who have the same panel might shed some light on what they’ve successfully used. Good luck!

It sounds like you're navigating a bit of a tricky situation! From my experience, the trailing letters on cables often indicate revisions or specific tweaks for compatibility with different hardware versions. I would recommend reaching out directly to the manufacturer's support or checking any available forums dedicated to your hardware, as users there might have firsthand experience with those specific cable variants. Sometimes they can offer insights that aren’t in the manual or readily available online. Good luck with your project!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What is the recommended programming cable for downloading applications to the QPK-2D200-L2P-E Monochrome 6" LCD 24V Quick Panel hardware?

Answer: - The recommended cable for this purpose is the HMI-CAB-C49.

FAQ: 2. What are the different variants of the HMI-CAB-C49 cable and what do the trailing letters (-H or -J) signify?

Answer: - The different variants of the cable may include trailing letters like -H or -J, possibly indicating different versions. It is presumed that -H might be older than -J.

FAQ: 3. Is there a difference in compatibility between the cable versions labeled with trailing letters (-H or -J) and those without?

Answer: - Compatibility information between cable versions and hardware can be scarce, especially after the absorption of the Total Control Product line. It is advisable to seek clarity on compatibility for specific requirements.

FAQ: 4. How can I ensure compatibility between the HMI-CAB-C49 cable variants and the Quick Panel hardware?

Answer: - Further insights on compatibility between the cable variants and hardware versions can be valuable, especially if familiarity with the product line is limited. Seeking assistance from technical support or referring to updated documentation may help clarify compatibility issues.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →