How to Access and View an Old Siemens WinCC Project: Troubleshooting Server Configuration Errors

Question:

Hello, I am attempting to access an old Siemens WinCC project for viewing purposes only. The project is large and extensively configured with multiple terminals. When trying to load the project, an error message appears stating that the configured server cannot be found, suggesting to use the local computer as a server instead. Upon selecting yes, the following error is displayed: "Cannot open WinCC Project - Project Manager for the configured server is not running. Check the computer name of the server." I have searched various forums and performed checks to no avail. My goal is to simply view the old project to aid in creating a new one on a different platform. Any suggestions on how to resolve this issue?

Top Replies

Are you searching for a specific server that cannot be found? If this is the case and you are using a PC, you can try renaming your computer to match the server name. This should help resolve the issue, especially when using Factory Talk software. Additionally, renaming your PC may require you to realign your projects with your Windows user account for proper management.

I recently renamed my computer, but I'm unsure if the name I chose is accurate. I can access the Step 7 classic file to verify. I referred to the computer by the name of the OS system in the main directory. Is there a different method to confirm this information?

Hi there! It sounds like you're dealing with a pretty complex WinCC configuration. I had a similar issue and managed to work around it by directly copying the WinCC project files to a machine where the Project Manager is running. You should locate the .mpa file (WinCC project file) in your old project and copy it to your local machine. You might also need to install an identical or newer version of the WinCC software on your machine to successfully open the project. Remember that this workaround is just for viewing and you may still face some issues with functionality since the project was set up with multiple terminals. Best of luck with your new project!

It sounds like WinCC is trying to access a server that's no longer available. If the project was originally on a different computer or network, it might be struggling to resolve its dependencies. Since you'd only like to view the project, consider installing a standalone version of WinCC on your local machine. This should mitigate server-related errors. Additionally, ensure that the "WinCC Project Manager" service is running in your services settings. If it's stopped, try restarting it. Lastly, don't forget to run the application as an administrator. This could be a permissions issue as well.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I resolve the error message stating that the configured server cannot be found when trying to access an old Siemens WinCC project?

Answer: Answer: One possible solution is to use the local computer as a server instead of the configured server. However, if this results in the error "Cannot open WinCC Project - Project Manager for the configured server is not running," you may need to check the computer name of the server and ensure it is running.

FAQ: 2. What steps can I take to troubleshoot server configuration errors when loading a large and extensively configured Siemens WinCC project?

Answer: Answer: You can start by verifying the server configuration settings, checking the server's computer name, ensuring the Project Manager is running on the server, and confirming network connectivity. If the issue persists, seeking support from Siemens technical resources or forums may be beneficial.

FAQ: 3. I only need to view the old WinCC project for reference. Are there any alternative methods to access the project if encountering server configuration errors?

Answer: Answer: If you are facing difficulties accessing the project due to server configuration errors, you can consider transferring the project files to a local machine or another platform where the WinCC software is installed. This way, you can view the project without relying on the original server configuration.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →