How to Add DF-1 Driver for RS232 Communication in FactoryTalk: Step-by-Step Guide

Question:

I am able to create a DF-1 driver in Linx and view the PanelView display. However, when I launch FactoryTalk and attempt to copy the active configuration to my laptop, the DF-1 driver does not appear. Do I need to add it manually? If that’s the case, what are the steps to do so? Additionally, when I try to download to the unit via RS232, the DF-1 communication path never appears in the transfer utility. I want to confirm my ability to use RS232, as I encounter this issue occasionally, despite most of my equipment being connected via Ethernet. **I struggle with RS232; I find IP configurations much easier to manage.**

Top Replies

User "jasil" mentioned: "I've successfully configured a DF-1 driver in RSLinx on my desktop to connect with the PanelView. However, when I try to access this setup through FactoryTalk on my laptop and copy the running configuration, the DF-1 driver doesn't appear. Do I need to add this driver manually, and if so, how can I do it?" To clarify, you want to enable the DF-1 driver to view the PanelView on your laptop, similar to what you've done on your desktop. If that is your question, it’s important to note that RSLinx utilizes a harmony.rsh file to save configurations like this. Unfortunately, you cannot simply transfer this file from your desktop to your laptop. Instead, you should export the configuration file from your desktop and then import it on your laptop. However, keep in mind that this method has only about a 10% success rate for me. I often find it easier to configure both systems simultaneously to ensure consistency. Alternatively, you can manually set up the DF-1 driver on your laptop via the USB-to-serial port. This process automatically assigns the first COM port it detects, which is frequently associated with devices like your mouse, trackball, or touchpad. To locate the USB-to-serial port number, navigate to the Control Panel on your laptop and look under "Ports," depending on your Windows version. If your laptop is equipped with an actual serial port, opt for that one to ensure optimal performance.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →