How to Connect Delta PLC DVP-12SE with HMI for Remote Access via Internet

Question:

Greetings everyone! Recently, I came across a fascinating Youtube video in which an individual demonstrated how to connect a Delta PLC with an HMI, allowing remote access from a PC and Android device. What really caught my attention was the mention of accessing the PLC remotely through the internet. This revelation has sparked my interest, as I am currently working on a home automation project where the client desires control over all devices via their mobile phone. I am eager to learn about the protocols required for such remote access. Would utilizing ddns or no-ip be a viable option for this setup? For a more detailed explanation, you can watch the video here: https://www.youtube.com/watch?v=SPO-eimiCx8. Thank you all for any insights you may have.

Top Replies

If you're looking for tips on how to control a Delta PLC through an Android app, check out the informative video on 365evn V1. Any insights on how to achieve this would be greatly appreciated. Thank you.

Hello! Your project sounds very interesting. Yes, you can indeed use DDNS or No-IP for remote access, as they can provide a constant hostname while the IP address changes. This is especially useful if your ISP is providing a dynamic IP address. You'll set up a VPN alongside to ensure a secure and encrypted connection to your client's home network. For home automation, in addition to the PLC, I'd also recommend looking into MQTT protocol, which is a light-weight messaging protocol often used in IoT devices. Always remember, a secure and efficient implementation is key when dealing with remote access. Can't wait to hear more about your project!

Hey there! Definitely a fascinating concept. In fact, using DDNS or No-IP can be a solid solution for establishing remote access to your PLC. Utilizing these services will allow you to create a stable address for your home network, even if your IP address changes (which tends to happen with standard home networks). You can then leverage your mobile device or a remote computer to control your PLC through the internet. Furthermore, not only can you control the devices this way, but it also allows data to be extracted for analysis or other purposes. This flexibility and remote access can surely give your home automation project a big boost. Remember to put careful consideration into your network security though. Very insightful video, thank you for sharing!

Hey there! Yes, indeed, using services like ddns or no-ip can be a viable option for enabling remote access in your setup. They basically provide dynamic DNS services which help in resolving the issue of a changing IP address on your home network, thus maintaining a consistent address to connect to the PLC. However, proper security measures are crucial when you are creating such an accessible point into your home network. You might want to consider setting up a Virtual Private Network (VPN) for a more secure way to access your home automation control when you are outside of your network. This adds an extra layer of security between any external access and your home automation control.

That sounds like an exciting project! Using DDNS or No-IP can definitely be a practical solution for remote access; they help in assigning a consistent domain name to your dynamic IP address, making it easier to connect to your PLC remotely. Just make sure to also set up proper security measures, like a VPN or secure credentials, to protect against unauthorized access. If you're looking into protocols, considering MQTT or HTTP for communication might also be worth exploring, especially for mobile integration. Good luck with your home automation project!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: How can I connect a Delta PLC DVP-12SE with an HMI for remote access via the internet?

Answer: The process involves setting up the connection between the PLC and HMI to enable remote access, allowing control from a PC or mobile device.

FAQ: What protocols are required for remote access to a Delta PLC through the internet?

Answer: Utilizing protocols like ddns or no-ip can be viable options for setting up remote access to a Delta PLC for control and monitoring purposes.

FAQ: Is it possible to control a Delta PLC remotely through a mobile phone?

Answer: Yes, with the right setup and configuration, you can enable remote access to a Delta PLC from a mobile phone, allowing control over connected devices.

FAQ: Where can I find more information on connecting a Delta PLC with an HMI for remote access?

Answer: You can refer to resources like online tutorials, forums, and videos, such as the one mentioned in the discussion thread (https://www.youtube.com/watch?v=SPO-eimiCx8), for detailed explanations and insights on setting up remote access.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →