How to Connect HMI Proface to Mitsubishi FX3U PLC

Question:

Struggling to find information on connecting an HMI Proface to a communication cable? Unlike the straightforward communication cable for HMI Delta, the HMI Proface manual at https://www.pro-face.com/otasuke/files/manual/gpproex/new/device/data/mitfxcpu.pdf provides detailed information on the HMI but lacks information on the PLC, only mentioning color. On the other hand, the communication cable for HMI Delta is much simpler to understand. If you have an HMI Proface and need to read the cable, you can create and practice with it after obtaining the necessary information.

Top Replies

When examining this diagram, the pinout for a 422 connection on the 8-pin Mini Din connector is located on the left-hand side. This pinout is crucial for establishing a reliable connection for data transmission.

In the diagram, the pinout for a 422 connection on the 8-pin mini din can be seen on the left-hand side. How can one determine if it belongs to com 1 or com 2 on hardware HMI? Any tips on identifying the correct port? View attachment 72070 for reference.

Based on the provided diagram, it appears that mode 3 communication 2 should be used, assuming your PLC card is equipped with a 422-BD add-on board or a built-in programming port. To utilize the 422-BD, it simply needs to be enabled in the PLC parameters. The default setting for the programming protocol should align with what the HMI is set to use.

I can understand your confusion here. The Proface manual isn't as straightforward as the one for Delta when it comes to the PLC. Something that helped me in the past was reaching out to Proface's customer support team for further clarity. Alternatively, you may also consider consulting with a local expert or technician with experience in HMI Proface setup. They could potentially show you practical application of the manual's instructions.

I totally get your frustration with the Proface manual; it's like they expect you to just know what to do! Have you tried reaching out to Proface customer support or checking forums specifically dedicated to Proface users? Sometimes, other users can share their experiences or even post diagrams that aren’t in the manual. Also, if you can find the specific PLC model you're working with, their manuals often have the relevant cable connection details. Good luck!

I totally understand your frustration! Proface’s documentation can sometimes be a bit vague when it comes to PLC connections. Have you checked any user forums or communities specifically for Proface users? Often, other users share their experiences and might have diagrams or specific details about the communication cable you're looking for. You might also want to reach out to Proface support directly; they can be surprisingly helpful and may provide more detailed guidance. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Where can I find information on connecting an HMI Proface to a Mitsubishi FX3U PLC?

Answer: Answer: The HMI Proface manual at https://www.pro-face.com/otasuke/files/manual/gpproex/new/device/data/mitfxcpu.pdf provides detailed information on the HMI, but lacks information on the PLC. It mentions the color of the cable, which might not be sufficient for connecting to the Mitsubishi FX3U PLC.

FAQ: 2. How does the communication cable for connecting an HMI Proface differ from the one for an HMI Delta?

Answer: Answer: The communication cable for HMI Delta is simpler to understand compared to the one for HMI Proface. If you are familiar with the HMI Delta cable, you may find the Proface cable more complex.

FAQ: 3. Is it possible to create and practice with the communication cable for connecting an HMI Proface to a Mitsubishi FX3U PLC?

Answer: Answer: Yes, once you obtain the necessary information about the cable and connections, you can create and practice with it to ensure successful communication between the HMI Proface and the Mitsubishi FX3U PLC.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →