How to Connect S7-300 PLC to Phoenix Visu: Troubleshooting Serial Communication Settings

Question:

Has anyone successfully connected an S7-300 PLC with Phoenix Visu before? I am currently working with a 317-2DP PLC, and I have connected the MPI port to my laptop using a USB-MPI Adapter. Despite setting up the communication driver, I am unable to locate the serial communication settings in the device manager. Can anyone provide guidance on where to find these serial settings? I have also included images of my current settings for reference.

Top Replies

Based on the station properties screenshot, it seems that the Phoenix driver exclusively works with a serial PC Adapter, rather than a USB PC Adapter.

Are there additional driver type options available when using the 'Add' button? Unlock more possibilities for selecting the driver type with this feature.

When utilizing the 'Add' button, do additional options for selecting the driver type become available? The S7-300 platform offers two driver types, as shown in the attached screenshot. Currently, I am utilizing the S7-MPI PC Adapter for MPI communication. In regards to the serial PC adapter, does this require a PC with a serial port for direct connection?

There are two versions of the PC Adapter available: the 6ES7972-0CA23-0XA0 PC Adapter with a serial RS232 port, and the 6GK1571-0BA00-0AA0 PC Adapter USB with a USB port for the PC. Third-party software often only recognizes the serial PC Adapter. It's possible that the "S7 functions MPI/DP" driver may work with the PC Adapter USB. Another option is an adapter that converts Ethernet to MPI or DP, such as the popular communication adapter ACCON NetLink PRO compact, which connects PC to S7 controllers via MPI, Profibus, and PPI. Explore more at www.deltalogic.de.

JesperMP mentioned that there are two versions of the PC Adapter available: the 6ES7972-0CA23-0XA0 PC Adapter with a serial RS232 port for the PC, and the 6GK1571-0BA00-0AA0 PC Adapter USB with a USB port. Many third-party software applications only recognize the serial PC Adapter. One potential solution could be the "S7 functions MPI/DP" driver for the PC Adapter USB. Another option is an adapter that can convert Ethernet to MPI or DP. The compact all-rounder, our best-selling communication adapter, serves as a convenient programming and communication tool between the PC and S7 controllers. The ACCON NetLink PRO compact can be connected to the PLC via MPI, Profibus, and PPI. For more information, visit www.deltalogic.de. I attempted to use the "S7 functions MPI/DP" driver, but my laptop's address is set to 0, which cannot be changed as it requires a minimum address of 3. Consequently, I opted for an alternative solution.

I've successfully connected an S7-300 PLC with Phoenix Visu before and it can indeed be a bit tricky. If you're struggling to locate the serial communication settings, you should try looking under the 'Advanced Settings' in the device properties, specifically in the 'Port Settings' subsection. If you're still not seeing it, the issue might be with your adapter driver, as it needs to accurately translate the PLC protocols for your computer. Ensure your USB-MPI adapter driver is up-to-date and compatible with your PLC model. Hope this helps, and keep us updated on your progress!

From your description, it sounds like you've gone through most of the right steps. However, if you can't see the serial settings in Device Manager, it's possible your USB-MPI adapter isn't properly installed or isn't compatible with your version of Windows. Try reinstalling the adapter drivers and make sure they are up-to-date. As for the Phoenix Visu, ensure that you've chosen the correct PLC in the communication settings and correct MPI address. Hope this helps lead you in the right direction!

It sounds like you're on the right track, but the missing serial communication settings might be due to the drivers of your USB-MPI adapter not being properly installed. To troubleshoot, please try to reinstall the drivers, making sure they are the latest version compatible with your system. Also, check whether the adapter is recognized in device manager under 'Ports (COM & LPT)'. If it's showing under 'Other devices', you'll need to manually assign a COM port. Lastly, verify that you're using the correct communication protocol (i.e., MPI or Profibus). Hope this helps a bit!

It sounds like you're on the right track with the USB-MPI adapter! Have you checked if the device is showing up under COM ports in the Device Manager? Sometimes, they can be listed as a generic USB device. You'll want to make sure you have the correct drivers installed for your adapter as well. It could also be worth trying to connect through a different port or rebooting your laptop to refresh the connections. If you're still having trouble, consider checking Phoenix Visu’s documentation for any specifics on serial port settings or compatibility notes for S7-300. Good luck!

It sounds like you’re making some solid progress! For the serial communication settings, you should check the Device Manager under "Ports (COM & LPT)" to see if your USB-MPI adapter is recognized correctly. If it is, make sure to note the COM port number assigned to it. You might need to adjust the settings in Phoenix Visu accordingly, ensuring that the baud rate and other parameters match what your PLC expects. If you’re not seeing it listed, you may want to try reinstalling the drivers for the adapter, or see if it’s showing up under other categories in Device Manager. Good luck!

It sounds like you’re on the right track! For the MPI communication, you should ensure that your USB-MPI adapter is properly recognized by your system. In Device Manager, look under "Ports (COM & LPT)" to find the COM port number assigned to your adapter, which is crucial for Phoenix Visu setup. Also, double-check your baud rate and other settings in the driver configuration match what’s required by the PLC. If you’re still having issues, make sure that the driver for the USB-MPI adapter is up to date. Good luck, and I hope you get it working!

I’ve had a similar experience when trying to set up the communication for my S7-300 PLC with Phoenix Visu. Make sure that your USB-MPI adapter is properly recognized in the Device Manager; sometimes it might not show up if the drivers aren't installed correctly. Once you confirm it's there, go to the COM Ports section in Device Manager—you should find your adapter listed as a COM port. From there, you can configure the communication settings. If you still can’t see it, try using a different USB port or checking if the adapter requires additional drivers. Hope this helps!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I connect an S7-300 PLC to Phoenix Visu software?

Answer: - To connect an S7-300 PLC to Phoenix Visu, you can use a USB-MPI adapter to connect the MPI port of the PLC to your laptop. Ensure that you have set up the communication driver correctly.

FAQ: 2. I cannot locate the serial communication settings in the device manager for my S7-300 PLC. What should I do?

Answer: - If you are unable to find the serial communication settings in the device manager, double-check the setup of your USB-MPI adapter and ensure that the driver is installed properly. You may also need to check the configuration settings on the PLC.

FAQ: 3. Where can I find guidance on setting up serial communication between an S7-300 PLC and Phoenix Visu?

Answer: - You can refer to the documentation provided with your PLC and Phoenix Visu software for detailed instructions on setting up serial communication. Additionally, online forums and user communities may offer troubleshooting tips and solutions.

FAQ: 4. What are some common issues when connecting an S7-300 PLC to Phoenix Visu via serial communication?

Answer: - Common issues when connecting an S7-300 PLC to Phoenix Visu via serial communication include incorrect driver installation, misconfigured settings on the PLC or software, and hardware connection problems. Double-check these aspects to troubleshoot any connectivity issues.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →