How to Connect Siemens PLC CPU 1212c DC/DC/DC with Delta VFD-EL using Profinet Technology

Question:

Is it possible to establish a connection between a Siemens PLC [CPU 1212c DC/DC/DC] and a Delta VFD-EL using Profinet technology?

Top Replies

As per the Delta manual, only Profibus is listed as a supported protocol, with no mention of Profinet compatibility.

Thank you for getting back to me, sir. Your prompt response is greatly appreciated!

User Vishnu244 is curious about connecting a Siemens PLC (CPU 1212c DC/DC/DC) with a Delta VFD-EL using a Profinet connection. It is important to note that only the VFD-C2000 model from Delta Electronics is equipped with a Profinet communication module. However, the VFD-EL allows for the addition of communication modules such as DeviceNet, Profibus, CANopen, and LonWorks.

I appreciate you informing me, sir.

Upgrade your S7-1200 by incorporating a 6GK7243-5DX30-0XE0 module to enable DP master functionality. Looking ahead to 2024, it is advisable to transition to Ethernet/Profinet for improved connectivity and to steer clear of Profibus.

From my understanding, you may encounter some hurdles trying to establish a direct connection between a Siemens S7-1200 PLC (like the 1212c DC/DC/DC) and a Delta VFD-EL drive, especially using Profinet. The Delta VFD-EL series, as per my knowledge, doesn't support Profinet communication natively, it only supports Modbus RTU and ASCII. I would suggest using a Profinet to Modbus gateway or converter to make this work, or consider switching to a Delta drive that supports Profinet, if it's not too late. Always remember to thoroughly check the communication protocols your devices support before planning the connections.

Sure, it's possible to establish a connection between a Siemens PLC [CPU 1212c DC/DC/DC] and a Delta VFD-EL, but not directly using Profinet, because the Delta VFD-EL doesn't support Profinet. You'd need to use a gateway to convert from Profinet to Modbus or whatever communication protocol the VFD supports. It does require a bit of knowledge about both technologies, but it's doable. Would recommend seeking expert assistance if you're not already familiar with this kind of setup.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: Q1: Can a Siemens PLC CPU 1212c DC/DC/DC be connected to a Delta VFD-EL using Profinet technology?

Answer: A1: Yes, it is possible to establish a connection between a Siemens PLC CPU 1212c DC/DC/DC and a Delta VFD-EL using Profinet technology.

FAQ: Q2: What is the recommended approach for connecting a Siemens PLC CPU 1212c DC/DC/DC with a Delta VFD-EL via Profinet?

Answer: A2: The recommended approach would involve configuring the Profinet communication settings on both devices and ensuring compatibility between the PLC and the VFD.

FAQ: Q3: Are there any specific considerations or settings that need to be configured when connecting a Siemens PLC CPU 1212c DC/DC/DC with a Delta VFD-EL using Profinet?

Answer: A3: It is important to ensure that both devices are configured with the correct Profinet parameters, such as IP addresses, subnet masks, and communication settings to establish a successful connection.

FAQ: Q4: Are there any troubleshooting tips available in case of connection issues between a Siemens PLC CPU 1212c DC/DC/DC and a Delta VFD-EL using Profinet?

Answer: A4: Troubleshooting steps may involve checking the network configuration, ensuring proper cabling, verifying device compatibility, and diagnosing any error messages or indicators on

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →