How to Connect Unipulse Load Cell Controller to Mitsubishi HMI GOT2000 without PLC

Question:

Hello everyone, I am looking to connect my unipulse load cell controller to a Mitsubishi HMI GOT2000 using RS232 communication. The catch is that there is no PLC connected to the HMI. I need to directly transfer load data to the HMI. If you have any ideas or suggestions on how to achieve this, please share them with me. Thank you.

Top Replies

You do not need a PLC to connect to the GOT. If the load cell controller uses a common industrial protocol like Modbus, you can easily connect to it using the built-in driver. However, if your controller only supports ASCII, the process can be a bit more complex. In this case, setting the controller to transmit automatically and utilizing the Barcode reader configuration can help bring the data from the RS232 port to the HMI field. From there, you can use a script to manipulate the data as needed. To avoid seeing raw data, you can set the colors to blend with the background. If the scale requires a prompt before sending data, it may pose a challenge as the built-in scripting may not directly access the serial port. Good luck with your setup!

While it's not common practice to connect an HMI directly to a load cell controller sans PLC, it might still be possible. I'd suggest exploring the direct data mapping abilities of the Mitsubishi HMI GOT2000 first. If it can directly communicate with RS232-based devices, you could possibly pull real-time data from your Unipulse controller. Please note that the communication protocol setup could be challenging without a PLC as a mediator. Perhaps a micro-controller might provide a feasible workaround if the GOT2000 can't be mapped directly to Unipulse controller. Hope this steer helps, good luck!

Hey! That sounds like an interesting challenge. Since you’re looking to connect the Unipulse load cell controller directly to the Mitsubishi GOT2000 HMI via RS232, you might want to start by checking the communication protocols supported by both devices. If you can configure the load cell controller to send data in a format that the HMI can understand, you should be able to set up the serial communication successfully. Also, consider using a serial to Ethernet converter if you run into any limitations—sometimes that can simplify connectivity issues. Good luck, and I hope you find the right solution!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Question: Can I connect a Unipulse load cell controller to a Mitsubishi HMI GOT2000 without a PLC?

Answer: Answer: Yes, it is possible to connect the Unipulse load cell controller directly to the Mitsubishi HMI GOT2000 using RS232 communication without the need for a PLC.

FAQ: 2. Question: What communication protocol is recommended for connecting the load cell controller to the HMI?

Answer: Answer: RS232 communication protocol can be used to establish a direct connection between the Unipulse load cell controller and the Mitsubishi HMI GOT2000.

FAQ: 3. Question: How can I transfer load data from the load cell controller to the HMI without a PLC?

Answer: Answer: To transfer load data directly to the HMI without a PLC, you can set up the communication parameters, such as baud rate and data format, between the load cell controller and the HMI using RS232 communication.

FAQ: 4. Question: Are there any specific configurations or settings needed to establish the communication between the load cell controller and the HMI?

Answer: Answer: Yes, you will need to configure the communication settings such as baud rate, data bits, stop bits, and parity on both the load cell controller and the HMI to ensure successful data transfer.

FAQ: 5. Question: What are some tips for troubleshooting communication issues between the load cell controller and the HMI?

Answer: Answer: If you encounter communication issues, ensure that the communication