How to Create a Shared Folder Connection with Allen-Bradley PV+ 7 HMI for CSV File Generation?

Question:

Hello everyone, I am wondering if it is feasible to establish a shared folder connection between my laptop and my Allen-Bradley PV+ 7" Standard HMI (model number 2711P-T10C21D8S Series D). My goal is to generate a .csv file, input data, and save it to a shared folder accessible on the PV+. Can this be achieved? Thank you.

Top Replies

I am currently utilizing FTME and I am wondering if this will necessitate the use of SE. Thank you once again.

Should I communicate with the PLC directly and exclude the HMI from the process for optimal results?

If you own a Plus and are skilled in dancing Samba, then the answer is affirmative.

According to L33er, if you own a Plus model and possess Samba dancing skills, then the answer is yes. Interested in learning more about Samba?

Yes, it is quite feasible. Your Allen-Bradley PanelView Plus 7 Standard HMI supports file transfers via FTP server. You can set up an FTP client on your laptop and establish a connection with the HMI. By doing this, you should be able to generate a .csv file on your laptop and save it directly to the desired location on the PanelView Plus. Once it's saved, you should be able to access it from the HMI. Just make sure your firmware version supports this as older versions might not.

Hey there, your idea sounds interesting. While Allen-Bradley PanelView Plus 7 does provide data handling capabilities, it doesn't inherently support shared folders like a PC would. However, you can leverage RSView Studio's DataStore Plus (or similar feature in FactoryTalk View) to log your data in .csv format. You can then manually or automatically move these files to your laptop over the network using 'File Transfer' feature available in the terminal settings (available with firmware 5 and above). This roundabout way should help you achieve your goal.

Hey there! Establishing a shared folder connection between your laptop and the Allen-Bradley PV+ HMI is definitely a challenge, but it's not impossible. While the HMI generally doesn't support direct file sharing like a traditional computer, you could set up a communication protocol, such as using a PLC to facilitate the data transfer. Alternatively, if you're using a Windows-based system for your HMI, consider using FTP or a similar method for data exchange. Just make sure to check your firmware compatibility and any network configurations that might be needed. Good luck with your project!

Hey there! While it's a great idea to have a shared folder setup for easier data management, it might be a bit tricky with the PV+ HMI since it's primarily designed for display and control rather than complex file operations. You'd likely need to set up a communication protocol, such as Ethernet/IP or use an OPC server, to facilitate the data transfer into the HMI or a connected PLC, which could then handle writing the .csv files. Make sure to check the firmware compatibility and any limitations with your specific HMI model regarding file handling and external connections. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Can I create a shared folder connection between an Allen-Bradley PV+ 7" HMI and a laptop? - Yes, it is possible to establish a shared folder connection between your laptop and an Allen-Bradley PV+ 7" HMI.

FAQ: 2. How can I generate a .csv file on an Allen-Bradley PV+ 7" HMI?

Answer: - You can generate a .csv file on the HMI by inputting data and saving it to a shared folder accessible on the PV+.

FAQ: 3. What model of Allen-Bradley PV+ 7" HMI supports shared folder connections?

Answer: - The discussion mentions using the Allen-Bradley PV+ 7" Standard HMI with model number 2711P-T10C21D8S Series D for creating a shared folder connection.

FAQ: 4. Is it feasible to save data to a shared folder on the Allen-Bradley PV+ HMI?

Answer: - Yes, the goal of saving a .csv file to a shared folder accessible on the PV+ can be achieved.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →