How to Downgrade FactoryTalk View Studio Project File from Version 6.1 to 5.1

Question:

I am facing an issue with my FactoryTalk View Studio software versions. My runtime files are in version 5.1 despite having version 6.1 of the software. When attempting to restore from the 5.1 runtime files, I encounter a password protection message even though I did not set a password. Is there a method to revert the project file from 6.1 to 5.1?

Top Replies

arakhith_behera inquired about the possibility of downgrading a project file from version 6.1 to 5.1. While there may not be a direct way to downgrade the project file, you can still generate a runtime file for version 5.1 using FactoryTalk View (FTV) 6.1.

I own two laptops, one running FTVIEW 6.1 and the other with FTVIEW 5.1. Unfortunately, the laptop with FTVIEW 6.1 is malfunctioning, and I need to transfer the project file to FTVIEW 5.1. Upgrading FTVIEW 5.1 to 6.1 is not possible due to it running on Windows XP. I attempted to install Windows 7 on another laptop to run FTVIEW 6.1, but encountered errors each time I tried to open a project, resulting in a message stating that Windows had stopped the program.

In the past, I encountered a technical issue with my Windows XP laptop running RSView Studio v4.something. Despite the software crashing and being unresponsive to repair or uninstall attempts, I found a solution by transitioning to VMWare Player. I continue to maintain and utilize my original Windows XP virtual machine with RSView. If you're facing a similar dilemma, I highly recommend pursuing this route for a seamless transition.

Arakhith_behera mentioned encountering a password protection issue while trying to restore from a runtime file of version 5.1. Despite not setting any passwords, the file still shows as password-protected. It is possible that the file was saved in a protected format rather than specifically being password-protected. Files created in a 64-bit environment using v5 and 5.1 runtime versions may not allow conversion back to a project due to changes in Rockwell's tag database during that time. Click here for more information.

If you encounter conversion issues preventing you from using the application manager to restore a project, don't worry - there are alternative methods available. One option is to open the MER file and run it on your PC terminal. Then, create a new project and import the running project from the temporary files stored in the project directory for FactoryTalk View ME. Additionally, consider reaching out for assistance from others who may be able to help convert the project to a usable state.

I've encountered a similar issue before. FactoryTalk View Studio doesn't support direct restoration of runtime files from newer versions to older ones and could manifest as your current password problem. A workaround might be to create a backup from your 6.1 version and manually rebuild it in the 5.1 software. Don't forget to save all the scripts and screens separately to smoothen the process. It's a bit time-consuming but it should be effective.

It sounds frustrating to deal with those version discrepancies and the unexpected password prompt! Generally, downgrading a project file from version 6.1 to 5.1 is tricky, as FactoryTalk doesn't always support that directly due to compatibility issues. One workaround could be to check if you have a backup of the project in 5.1 format, or see if it's possible to export the components you can access into a new 5.1 project manually. Regarding the password protection, sometimes projects can have default passwords set by the software; you might want to reach out to Rockwell support or check their forums for advice specific to this issue. Good luck!

It sounds really frustrating to deal with those version mismatches in FactoryTalk! Unfortunately, downgrading a project from version 6.1 back to 5.1 isn't officially supported, as the newer versions may use features or settings not compatible with the older runtime. For the password protection issue, sometimes files can inadvertently pick up a password setting during upgrades, or it might be a glitch. Have you tried reaching out to Rockwell Automation support? They might offer some guidance on recovering your project files or tackling the password issue. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I downgrade a FactoryTalk View Studio project file from version 6.1 to 5.1?

Answer: Answer: To downgrade a project file, you may need to use the FactoryTalk View Studio software. However, keep in mind that downgrading project files can have limitations and may require careful handling.

FAQ: 2. Why am I encountering a password protection message when trying to restore from version 5.1 runtime files even though I didn't set a password?

Answer: Answer: The password protection message could be due to compatibility issues between the software versions. It's important to ensure that you have the correct permissions and settings configured to avoid such issues.

FAQ: 3. Are there any specific steps or considerations to keep in mind while downgrading a FactoryTalk View Studio project file?

Answer: Answer: When downgrading project files, it's crucial to backup your data and project files to prevent any loss of information. Additionally, you may need to consult the software documentation or contact technical support for guidance on the downgrade process.