How to Export an Array of 100 Elements in Allen Bradley Studio 5000 and View Tag Values

Question:

Greetings, everyone! **Note: Utilizing Allen Bradley Studio 5000** I am working with an array consisting of 100 elements to collect specific data. To populate this array, I employed the FIFO (First In, First Out) method. Now that the FIFO process is complete, I aim to export the values stored in my array. When I navigate to Tools -> Export -> Tags and Comments, I successfully export my tags and comments, including my array tag. However, I am unable to view the actual values associated with these tags. It’s unclear whether I am missing a step or if there is an alternative method required to retrieve the values of my array. I would greatly appreciate any assistance or guidance on how to resolve this issue. Thank you!

Top Replies

Unfortunately, I believe it doesn't function that way. However, if you're open to utilizing Python, I can assist you in extracting the data into a text file or a similar format. If you're interested in this process, please provide me with the IP address of the PLC and the specific tag name. Additionally, if the tag corresponds to a data structure, I would need details about that as well.

The Export Tags feature specifically extracts the tag structure but does not include the tag values. To retrieve your data, right-click on the rung associated with your "FIFO" and choose the "Export Rung" option. This will generate an L5K file that you can open with any text editor. Amidst the numerous lines of data, you'll locate the "CDATA" for your FIFO tag presented as a series of CSV numbers. You can easily copy this information, paste it into a CSV file, and then open it in Excel for further analysis. Best of luck with your data extraction!

User dmroeder commented: "Unfortunately, I don’t believe it works that way. However, if you're comfortable with Python, I can assist you in exporting the data to a text file or a similar format. If you're interested, please provide me with the IP address of the PLC and the specific tag name. Additionally, if the tag represents a data structure, I would need details about that as well." In response, I said: "Hello Dmroeder, do you have a Python module that can access PLC tag values? I have Python 3.6 installed on my work computer and I'm eager to give it a try; this would also be a valuable learning opportunity for me. I apologize, but I'm unable to share the IP address of the PLC due to strict policies at my workplace regarding sensitive information. I hope you can understand my position. I would greatly appreciate it if you could share some insights on how to access the tag value using Python. Thank you for your assistance!"

Backendcode inquired: "Hello Dmroeder, do you have a Python module available for accessing PLC tag values? I have Python 3.6 installed on my work computer, and I'm eager to learn more about this. Unfortunately, I cannot share the PLC's IP address due to strict policies at my workplace, and I trust you understand my situation. If you could provide guidance on how to retrieve tag values using Python, I would greatly appreciate it. Thank you for your assistance!" In response, I would say: "Just give me a moment, and I'll provide you with some resources. The existing module for accessing tags is compatible with Python 2.7.x; however, I have developed an updated version that includes support for Python 3. I just haven't uploaded the latest commits to GitHub yet." By utilizing keywords related to Python programming, PLCs (Programmable Logic Controllers), and module support, this rephrased text enhances SEO-friendliness while maintaining the original message's core intent.

To enhance your experience with Logix, consider installing the Tag Upload/Download tool, which is typically included in the Logix installation package. You might already have this tool accessible; simply navigate to the menu bar and select **Tools** > **Tag Upload/Download Tool**. If you're looking for alternatives to Python for data manipulation, VBA (Visual Basic for Applications) in Excel is a robust option. You can find comprehensive guidance and code snippets needed for reading and writing data to the PLC by referring to the VBA section in the RSLinx help documentation. This approach allows seamless communication with your PLC while utilizing familiar Excel functionalities.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →