How to Extract Program from QuickPanel Control IC754CGL06CTD-EE

Question:

Greetings! I am in search of the necessary software and cable to modify or upgrade an old QuickPanel Control with the part number IC754CGL06CTD-EE. I am struggling to find the information on the GE website. Can anyone provide guidance on what version of QuickDesigner I should use to extract the program from the control panel? Your help is greatly appreciated.

Top Replies

I'm pleased that you followed my recommendation to create your own discussion topic. It would have been more beneficial to post it in the main forum section rather than the practice area, as posts in the practice area often receive less attention. To proceed, you will need to acquire Proficy Machine Edition software, as GE transferred their PLC and HMI product lines to Emerson some years ago. Contact your local Emerson sales office for guidance on obtaining a trial version. Total Control Products provides Quick Designer software, the original supplier of GE's Quick Panel product line. Keep in mind that there is no assurance that you will be able to extract the application from the Quick Panel. The original programmer holds the power to allow or deny end users from uploading. If they do not permit uploads, you may encounter difficulties.

I want to express my gratitude to Steve for the prompt response and clear explanation. I have another inquiry: Is it possible to create a backup of the HMI using a flash memory or SD card, and then access it using the PME software?

It should theoretically be feasible as the QP system operates on Windows CE. It is crucial to locate the files provided by Proficy for the HMI. While I have not personally attempted this method, I believe it may be more challenging than it's worth. If the initial programmer restricted project uploading, your approach may not circumvent this limitation.

Hello Steve, I wanted to express my gratitude for your assistance, and apologize for the delay in my response due to the holiday season in Morocco. Today, I successfully established a connection to the HMI and uploaded the project. Here are the details: - Software: Proficy Machine Edition - Version: 7.0 - Operating System: Windows 7 Pro - Communication method: Ethernet cable - Panel Reference: IC754CGL06CTD-EE For the process: I initiated a new project in PME, added a new target (Quickpanel view/control), set the IP addresses for both the target and my computer (2.255.88.140 for the HMI and 2.255.88.211 for my PC), and completed the upload by right-clicking.

I'm thrilled that you received it and appreciate your feedback. Thank you!

Hello! To extract the program from the QuickPanel Control with that specific part number, you may need to use QuickDesigner version 3.7 or newer. Regarding the cable, you would need the IC690ACC901 mini converter kit. The GE website can indeed be a labyrinth at times, so it'd also be worth reaching out to their tech support for detailed information to ensure everything goes smoothly. It's best to double-check so as not to cause any inadvertent damage to your system. Good luck with your upgrade project!

Sure, happy to help! Based on the part number you've shared, it appears that you have a device belonging to the GE QuickPanel+ series. This range usually requires the Proficy Machine Edition software rather than QuickDesigner. As for extracting the program, you would need the appropriate programming cable and drivers. The cable type depends on the communication port: a serial cable (IC690ACC901) for RS232, or Ethernet for newer models. It can be a little daunting navigating these older systems, but don't worry, you'll get used to it. Keep us updated on your progress and let us know if you need further assistance.

Hey there! I’d suggest checking out QuickDesigner version 6.0 or later, as these should be compatible with your QuickPanel model. If you’re looking to extract the program, make sure you have the right serial cable for communication, usually a standard RS-232 to USB converter works well. You might also want to check online forums or user groups dedicated to GE products; they've been really helpful for me in the past. Good luck with your project!

Hey there! For your QuickPanel Control IC754CGL06CTD-EE, you should be using QuickDesigner version 7.0 or earlier to ensure compatibility when extracting the program. The software isn't always easy to find, but you might have luck checking with vendors online or even forums where others have faced similar upgrades. As for cables, make sure you have the right serial communication cable, typically the 4-pin connector type. Good luck with your upgrade!

Hey there! For your QuickPanel Control with the part number IC754CGL06CTD-EE, you’ll want to use QuickDesigner version 5.0 or later for compatibility with your model. As for the cable, a standard USB to serial adapter should work, but make sure it’s compatible with the programming port. If you’re still having trouble locating resources, sometimes reaching out to GE’s customer support can yield helpful information too. Good luck with your upgrade!

Hey there! For the QuickPanel with part number IC754CGL06CTD-EE, you'll want to use QuickDesigner version 5.0 or earlier to extract the program, as newer versions may not be fully compatible with older hardware. As for the cable, a standard RS-232 serial cable should work, but make sure you have the right connectors for the QuickPanel. If you're still stuck, consider checking out some forums dedicated to GE products – they're often treasure troves of specific advice. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. What software and cable are needed to modify or upgrade a QuickPanel Control with part number IC754CGL06CTD-EE? - To modify or upgrade a QuickPanel Control with part number IC754CGL06CTD-EE, you will need the appropriate software, which in this case would be QuickDesigner. Additionally, you will need a compatible cable to establish a connection between the control panel and your computer.

FAQ: 2. Where can I find information on extracting the program from a QuickPanel Control IC754CGL06CTD-EE?

Answer: - Information on extracting the program from a QuickPanel Control IC754CGL06CTD-EE may not be readily available on the GE website. It is recommended to seek guidance from forums, user groups, or reach out to GE support for assistance.

FAQ: 3. Which version of QuickDesigner should I use to extract the program from a QuickPanel Control IC754CGL06CTD-EE?

Answer: - The version of QuickDesigner required to extract the program from a QuickPanel Control IC754CGL06CTD-EE may vary. It is advisable to refer to the product documentation, manuals, or contact GE technical support to determine the compatible version for your specific control panel model.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →