Hey there! I'm looking for the RMCT version that is compatible with the 1756-RM2 ver 20.017. I currently have RMCT ver 8.2.1.0, but I received a notification to update when trying to configure the 1756-RM2. Any suggestions? Thanks a lot! - Kardel
If you're wondering which version of RMCT is compatible with your 1756-RM2 ver 20.017, you'll need to upgrade the firmware based on your specific architecture. Please note that ver 20.017 refers to the internal BOOT firmware, not the application firmware. According to Rockwell Automation's website, available application firmwares include versions 20.004, 20.005, 20.007, and RMCT v8.1.5. To determine the best version for your system, consult the redundancy manual and consider your ControlLogix firmware. For more information, refer to TN165251 - ControlLogix: Redundancy Firmware Bundle Revision History on TechConnect.
nhatsen recommended updating the RM2 firmware based on your designed architecture. It may be confusing, but ver 20.017 is only the internal BOOT firmware, not the application firmware. The RA page offers application firmwares like 20.004, 20.005, 20.007, RMCT v8,1.5. Consult the redundancy manual to determine the compatible version, mostly dependent on ControlLogix firmware. For more information, refer to TN165251 - ControlLogix: Redundancy Firmware Bundle Revision History (Access Level: TechConnect). Thanks to nhatsen for the valuable assistance.
Dear friends, I am looking for the RMCT v8.1.5 software tools from Rockwell Automation. Unfortunately, the RMCT is not available on their site. If anyone has a link to download it, please send it my way. Thank you in advance. -tamil
Looking for RMCT v8.1.5 software tools from Rockwell Automation site but it's not available there? No worries! You can find it by visiting the Rockwell site and navigating to Drivers & Firmware section. Search for the 1756-RM2/A, version 20.004 bundle which includes the RMCT v8.01.05. Happy downloading!
A user reached out to me privately about this, but I believe it's worth sharing with the community. For all those wondering, tamilaotc, welcome to the forum! You can find the RMCT software as a "Product Add On" in the firmware downloads section for redundancy modules. Regards, George.
Hi Kardel! It sounds like you might have a compatibility issue. You'll need to use RMCT version 12.06 or later to properly interface with the 1756-RM2 ver 20.017. I would recommend upgrading your RMCT to solve this. You can typically find these updates on the manufacturer's official website. I hope this helps!
Hey Kardel! You might want to try RMCT ver 20.015 if you're trying to sync with the 1756-RM2 ver 20.017. Usually, the versions should match or be very close to each other to ensure compatibility. Always remember to back up your data and configuration before updating to avoid any potential issues. Hope this helps!
Hi Kardel, you seem to be encountering a common issue. I recommend you check the Rockwell Automation website or their Product Compatibility and Download Center. You'll probably need to upgrade your RMCT version. Anything at or above version 20 should work seamlessly with your 1756-RM2 ver 20.017. Ensure you check the specific compatibility details to avoid future tech hiccups. Cheers!
Hi Kardel! You would need RMCT version 9.00.01 or above to make it compatible with 1756-RM2 ver 20.017. If your current RMCT version is 8.2.1.0, it would indeed require an update to smoothly work with your system. So, I would recommend you to acquire the latest version to ensure compatibility and improved performance. Keep in mind to back up your current configurations before upgrading, just to be safe. Good luck with your updates!
Hey Kardel! For the 1756-RM2 ver 20.017, you'll generally want to upgrade to a later version of RMCT that supports ControlLogix 5570 hardware. Typically, RMCT version 9.0 or higher should do the trick, as it addresses compatibility issues with newer firmware. Before upgrading, make sure to back up your configurations just in case. Good luck, and let me know if you need any more help!
✅ Work Order Management
✅ Asset Tracking
✅ Preventive Maintenance
✅ Inspection Report
We have received your information. We will share Schedule Demo details on your Mail Id.
Answer: Answer: The compatible RMCT version for the 1756-RM2 ver 20.017 is usually specified in the product documentation or technical specifications. It's essential to ensure that your RMCT version is compatible with the specific module version you are using.
Answer: Answer: If you received a notification to update RMCT while attempting to configure the 1756-RM2, it's advisable to follow the prompt and update your RMCT software to a version that is compatible with the 1756-RM2 ver 20.017. Updating the software can help ensure smooth operation and compatibility.
Answer: Answer: To verify compatibility between your RMCT version and the 1756-RM2 ver 20.017, you can refer to the official documentation or contact the product support team. They can provide you with the necessary information regarding compatible versions and any required updates.