How to Find VNC Viewer in FactoryTalk Optix Standard Version

Question:

Hello everyone, I am currently evaluating the use of FactoryTalk Optix for providing a remote HMI interface for my existing systems, which include PanelView Plus and Weintek screens. I have heard that FactoryTalk Optix offers a VNC Viewer option, but I am having trouble locating it within the Standard version. Can anyone provide guidance on where to find this feature, or is it only available in the Pro version? Your input would be greatly appreciated. Thank you.

Top Replies

Do you have any insights on utilizing FactoryTalk Optix to connect a VNC Client for remote viewing of another HMI? Let me know your thoughts on this integration.

Is it possible to incorporate a VNC Viewer into a FactoryTalk ME/SE project, similar to how it can be done with Weintek Easy Builder Pro? I am curious if Rockwell software offers the same feature. I am aiming to display a VNC Viewer as an embedded window on a screen, along with additional buttons, lamps, and controls, all within the same HMI screen.

With Optix, there is no need for a VNC viewer – simply purchase the necessary license tokens and access the runtime as seamlessly as if you were right at the control panel.

bgtorque inquired if it is possible to use FactoryTalk ME/SE to embed a VNC Viewer on a screen, similar to Weintek Easy Builder Pro. The goal is to integrate additional buttons, lamps, and controls alongside the VNC Viewer on the HMI screen. Alternatively, using a third-party screen to display the FactoryTalk screen is a cost-effective solution that simplifies the process. Optix, while an option, may not offer the same features and design consistency as FactoryTalk. Developing the screen from scratch with Optix may not provide the desired functionality and aesthetic appeal akin to FactoryTalk.

Hi there! I've been using FactoryTalk Optix for a while, and as far as I know, the VNC Viewer feature is not included in the Standard version. I believe it's exclusive to the Pro version. That upgrade provides quite a few additional features that you might find useful for remote interfacing. Hope this helps, and don't hesitate to reach out if you have more questions.

Hey! I understand your confusion—FactoryTalk Optix can be a bit tricky to navigate. The VNC Viewer option is indeed part of the Pro version, which is likely why you're not seeing it in the Standard version. If remote access is a key requirement for your setup, it might be worth considering an upgrade to Pro, or alternatively exploring other remote access solutions that work well with your current systems. Good luck!

Hey there! The VNC Viewer feature in FactoryTalk Optix is actually only available in the Pro version, so if you're using the Standard version, that’s why you’re having trouble finding it. If remote access is a priority for your setup, it might be worth looking into an upgrade to Pro to utilize that functionality. If you go that route, just make sure to check the documentation for any specific requirements or setup steps. Hope that helps!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. How can I access the VNC Viewer feature in FactoryTalk Optix Standard version? - To access the VNC Viewer feature in FactoryTalk Optix Standard version, you can follow these steps: [Provide relevant guidance on locating the feature within the software]. 2. Is the VNC Viewer option exclusive to the Pro version of FactoryTalk Optix? - The availability of the VNC Viewer option in FactoryTalk Optix depends on the version. It is important to check the feature comparison between Standard and Pro versions to determine if the VNC Viewer is included in the Standard version.

FAQ: 3. Can FactoryTalk Optix be used to provide a remote HMI interface for PanelView Plus and Weintek screens?

Answer: - Yes, FactoryTalk Optix can be used to provide a remote HMI interface for PanelView Plus and Weintek screens. It offers the capability to remotely monitor and control these systems through a user-friendly interface.

FAQ: 4. Are there any alternatives to VNC Viewer within FactoryTalk Optix for remote access?

Answer: - In case the VNC Viewer feature is not available in the Standard version of FactoryTalk Optix, there might be alternative remote access options provided. It is recommended to explore the software documentation or reach out to technical support for more information on available alternatives.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →