How to fix AB ControlLogix 5580 PLC NVRAM bad error issue

Question:

Hello everyone, I am in possession of an AB ControlLogix 5580 PLC. When I use my USB to scan it, an error message stating "NVRAM bad" appears. What steps should I take to address this issue?

Top Replies

Could you please provide a screenshot for clarification? It is important to specify if you are referring to the Windows Device Manager, RSLinx utility, or RSLogix5000 studio. The more information you give, the better chance we have of finding a solution.

I attempted to connect using both USB and Ethernet cables, successfully pinging the PLC. However, I am unsure of the process for installing firmware. Can you guide me through this step?

I'm facing a roadblock as my ControlFlash software does not have the PLC catalog number I need. This is hindering my progress and causing frustration.

TechConnect recommended upgrading to ControlFlash version 15.7 for optimal performance.

The Rockwell Automation website is currently undergoing maintenance and will be unavailable until July 21st.

Hi there! The "NVRAM bad" error typically suggests an issue with the non-volatile RAM in your PLC. This part stores important data that persists even when power is disconnected. I'd start by checking whether your firmware is updated or not, as outdated firmware can sometimes cause similar issues. If the PLC is under warranty, you might want to have AB look at it. If not under warranty, consult with a technician who can diagnose the problem - replacing a faulty NVRAM could be the last resort. Also, don't forget to regularly backup important data!

Hey there, sounds like you're dealing with a potentially troublesome issue. "NVRAM bad" generally indicates a hardware problem. However, before jumping to conclusions, try the power cycle; simply power off, wait for a few minutes, and then power back on. If that doesn't work, then sadly, you might be looking at replacement of the controller as ControlLogix controllers don't have user-replaceable NVRAM. Be sure to check with Rockwell Automation Support for official advice - they're really helpful, and they might have other suggestions or a fix that doesn't require a full replacement! Good luck!

Hey there, it seems like your NVRAM might be throwing that error due to a fault or corruption. You could try a simple reset first. However, if the issue persists, it may indicate a hardware problem with the NVRAM module itself. In such a case, it would advisable to reach out to Rockwell Automation's customer support or a reliable technician. They could guide you further in addressing the issue, perhaps even suggesting a replacement if necessary.

Hey there, it sounds like your NVRAM (Non-Volatile Random Access Memory) may be failing or corrupt. This typically holds the PLC's important boot up details and configuration settings. To solve this, your best bet is probably to backup all important configuration files you may need, then replace the damaged NVRAM chip. However, given the intricacy of this task, I'd suggest engaging with a professional or contacting Allen Bradley support to guide you further. Hope this helps!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What does the "NVRAM bad" error message on AB ControlLogix 5580 PLC mean?

Answer: The "NVRAM bad" error indicates an issue with the Non-Volatile Random Access Memory on the PLC, which can impact its functionality and data storage capabilities.

FAQ: 2. How can I fix the "NVRAM bad" error on my AB ControlLogix 5580 PLC?

Answer: To address the "NVRAM bad" error, you may need to perform troubleshooting steps such as checking the battery, resetting the PLC, or replacing the NVRAM module if necessary.

FAQ: 3. Is it possible to resolve the "NVRAM bad" error without replacing the AB ControlLogix 5580 PLC?

Answer: In some cases, the "NVRAM bad" error can be resolved through troubleshooting steps like resetting the PLC, replacing the battery, or reseating the NVRAM module without the need for a complete replacement.