How to fix afutil.dll error when opening Logix designer V35

Question:

I have been using Studio5000 version 35 without any issues, but today I am encountering a problem when trying to open it. An error message is displayed stating that the afutil.dll file cannot be found. If you have any suggestions on how to resolve this issue, please assist me.

Top Replies

Before considering re-installing, there are a few troubleshooting steps you can take. First, try performing a repair using the system apps menu in Windows. Additionally, make sure to run the latest patch released monthly on the RA website. Please note that there are no guarantees that either of these methods will resolve the issue.

Last week, I encountered difficulties regarding a message that initially made me believe the issue stemmed from corrupted module profile files. However, upon further investigation, I discovered that the problem was related to resources. For a detailed look at my troubleshooting journey, refer to my recent post on the forum: "Logix Designer v35.1 unable to edit module profiles (5580 - L83e - Flex5000)." Additionally, user jstolaruk provided valuable insights. During a conversation with a Rockwell Automation technician today, I learned that the memory usage of Logix Designer has been a key focus for the company in the past year. The release of version 36.1 reflects their commitment to improving this aspect. When you resume your work, upgrading to V36.1 may prove beneficial in preventing similar issues in the future.

Sorry to hear you're having trouble with Studio5000. Sometimes, such an issue could be because the afutil.dll file is either corrupted or possibly removed unintentionally. A simple solution could be reinstalling the software entirely to replace any missing or corrupted files. You might also want to check your system with a reliable antivirus software to eliminate any possibilities of a virus causing havoc with your .dll files. If you're very tech-savvy, you could also manually add the afutil.dll file, but be incredibly careful as messing with such files can cause other problems if not done correctly.

Hey, it seems like you might be dealing with a missing or corrupted DLL file. Generally, DLL issues occur due to overwriting of the existing DLL file by another software, or accidental deletion. You could try reinstalling Studio5000, as this usually puts the missing DLL files back into the system. If this does not solve your problem, upgrading to the latest version of Studio5000 might be helpful. Don't forget to back up your projects before you do any of the above-mentioned steps. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What does the error message "afutil.dll file cannot be found" mean when opening Logix Designer V35?

Answer: The error message indicates that a necessary file, afutil.dll, is missing or corrupted, leading to the software's inability to open properly.

FAQ: 2. How can I fix the afutil.dll error in Logix Designer V35?

Answer: To resolve the afutil.dll error, you can try reinstalling Studio5000 version 35 or repairing the installation to ensure all necessary files, including afutil.dll, are properly installed.

FAQ: 3. Are there any specific troubleshooting steps to resolve the afutil.dll error in Logix Designer V35?

Answer: Yes, you can try performing a clean reinstall of Studio5000 V35, updating your system's drivers, running a malware scan to rule out any malicious software affecting the file, or restoring the missing afutil.dll file from a backup or a reliable source.

FAQ: 4. Will reinstalling Logix Designer V35 fix the afutil.dll error?

Answer: Reinstalling Logix Designer V35 may resolve the issue if the error is due to a missing or corrupted afutil.dll file. However, it's recommended to backup your project files before reinstalling to avoid any data loss.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →