How to Fix Font Size Issue in Wonderware Intouch 2012 R2 After Transferring Application to New Computer

Question:

After transferring my application to a new computer, I noticed that the font size in Wonderware Intouch 2012 R2 had been altered. Upon inspecting the font properties, I discovered that the font name was missing. Can anyone assist me in resolving this font size issue in Wonderware Intouch 2012 R2 when moving applications to a different computer?

Top Replies

The issue was resolved after realizing that the font was not installed on the target computer. Once the missing font was installed, the problem was successfully solved.

I encountered a familiar issue when an IT professional swapped out a computer operating Wonderware software. Instead of seeing field descriptions, all I saw were empty boxes and numerical values. Following advice from a colleague to inspect the fonts, I transferred all Windows fonts to the new CPU. This simple fix successfully resolved the display issue, although I may have forgotten to inform the IT pro of the solution.

msohaibbutt discovered the solution to the issue: a missing font on the target computer. By installing the necessary font, the problem was successfully resolved. Could you provide a detailed step-by-step guide to address this issue further?

It sounds like the font used in the original application isn't installed on your new computer, so Wonderware Intouch 2012 R2 is probably defaulting to a different font. Try installing the font used on your old machine onto the new one, then reopen the application. If you no longer have access to the old machine or don't remember the font name, I suggest experimenting with different fonts until you find one that looks suitable.

Certainly, inconsistency in font size can occur when transferring an application onto a different system due to the different display parameters and settings. You might want to check if the required font is installed on the new computer. Also, try resetting Wonderware Intouch back to its default settings, sometimes it helps resolve such issues. If it persists, you could write a script that sets the font size upon opening. That said, ensure you are running the latest service pack, as this problem might have been fixed in recent updates.

It sounds like the particular font your application is trying to use might not be installed or properly registered on your new computer. This could cause the size and name to appear incorrectly. Try reinstalling the specific font (if you know which one it is) or reinstall the Wonderware Intouch 2012 R2 application with default settings. Make sure all necessary files are properly transferred. Hopefully, this should solve your problem.

It sounds like you might have a font on your old machine that didn't get transferred over to the new one, which is why the font name is missing. Wonderware Intouch probably defaulted to another font, causing a change in font size. I'd suggest checking the font on your old machine, and if it's a custom or non-standard font, be sure to install it on your new machine. This should bring the font size back to what you're used to. Please let me know if this helps.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Why does the font size change in Wonderware Intouch 2012 R2 when transferring applications to a new computer? - When applications are moved to a new computer, the font properties can sometimes be altered, leading to changes in the font size in Wonderware Intouch 2012 R2.

FAQ: 2. How can I fix the font size issue in Wonderware Intouch 2012 R2 after transferring my application to a different computer?

Answer: - To resolve the font size problem, you may need to inspect the font properties and ensure that the font name is correctly specified.

FAQ: 3. What could be the cause of the missing font name in Wonderware Intouch 2012 R2 after moving the application to a new computer?

Answer: - The font name may be missing due to compatibility issues or improper font configurations during the transfer process to the new computer.

FAQ: 4. Is there a specific troubleshooting step to address font size discrepancies in Wonderware Intouch 2012 R2 when migrating applications?

Answer: - One troubleshooting step is to verify and correct the font settings within Wonderware Intouch 2012 R2 to ensure that the font name is properly assigned.

FAQ: 5. Are there any best practices to follow when transferring Wonderware Intouch 2012 R2 applications to avoid font size issues on a new computer?

Answer: - It is recommended to double-check font properties before and after transferring applications to prevent font size problems in

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →