How to Fix Rotation Direction Issue with Allen Bradley 842D Encoder Replacement

Question:

Hello everyone, I recently replaced encoder 842D-60131331BXA with a new unit of the same part number. I made sure to adjust the dip switches and use the Preset Push button during installation. However, when I tested it, the new encoder rotated in the opposite direction. Even when I tried to change the direction via the HMI, it still rotated incorrectly. I ended up re-installing the original encoder and it worked perfectly. How can I fix the rotation direction of the new encoder? Your guidance is greatly appreciated. Thank you.

Top Replies

The encoders' CW/CCW direction can be easily programmed via the DeviceNet network. To adjust this setting and save it to nonvolatile memory, you can utilize RSNetworx for DeviceNet or a message instruction from the logic controller. May I inquire about the specific model of controller and DeviceNet interface module you are currently using? Also, do you have access to RSNetworx for DeviceNet software for configuration purposes?

Hello Ken, I am currently using the 1769-L33ER controller and the 1769-SDN for DeviceNet in my Allen Bradley setup. As a beginner, I'm not sure if I have the RSNetworx software installed, so I need to look into this further and educate myself on its functions. Do you have any guidelines or steps that can assist me in resolving this matter? I am actively investigating the situation now. Thank you for your assistance.

Access the user manual for Rockwell Automation products by following this link: https://literature.rockwellautomation.com/idc/groups/literature/documents/um/842d-um001_-en-p.pdf. This valuable resource provides detailed instructions on how to optimize the performance of your equipment.

Hi Ken, I am currently in the process of familiarizing myself with Allen Bradley and the equipment required for our system, such as the 1769-L33ER controller and the 1769-SDN DeviceNet. However, I don't have the RSNetworx software for Devicenet installed yet. Can you provide me with guidance on which version of the software I need to correctly set up our system? Your assistance is greatly appreciated.

Hey, seems like you have done everything right with the installation. I suspect that the new encoder might have a manufacturing fault, but before you return it, verify the wiring polarity. Even if a single wire is wired wrong, it can cause the issue you're describing. It might be worth double-checking this just to rule out a simple wiring mistake. If that checks out, it definitely could be a faulty unit. Good luck!

Hey there, it sounds like you've done everything right on the install. It's odd you're having this problem with a new direct replacement. Most of the time incorrect rotations are due to incorrect wiring (sometimes phase differences can affect rotation) or settings in the drive/controller. That being said, the new encoder may have a parameter you need to set or a pin you need to ground. If it's not that, consider contacting the manufacturer for further technical guidance. Remember, it's always possible you got a defective unit—doesn't happen often, but it's not unheard of either. Keep us updated!

It sounds like you've done a solid job with the installation and setup, but the issue with the rotation might be due to the encoder's settings. Sometimes, even if the dip switches are adjusted correctly, there can be internal settings or parameters that need to be configured in the HMI or the controller to match the new encoder's specifications. I’d recommend checking the encoder’s manual for any specific instructions regarding direction settings or look for any options in your HMI that could allow you to define the rotation direction. If that doesn’t work, it might be worth reaching out to the manufacturer’s support for further troubleshooting, as they might have seen this issue before. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Why is the new Allen Bradley 842D encoder rotating in the opposite direction after replacement? - The new encoder may be rotating in the opposite direction due to incorrect dip switch settings or improper installation procedures.

FAQ: 2. How can I fix the rotation direction issue of the new encoder?

Answer: - To fix the rotation direction issue of the new encoder, ensure the dip switches are correctly configured and try adjusting the settings via the HMI. If the issue persists, double-check the installation steps and refer to the user manual for troubleshooting guidance.

FAQ: 3. What should I do if changing the direction via the HMI does not resolve the rotation issue?

Answer: - If changing the direction via the HMI does not resolve the rotation issue, consider verifying the wiring connections, encoder alignment, and compatibility with the system. Consulting with technical support from Allen Bradley or a qualified technician may also help diagnose and rectify the problem.