How to Fix RS Logix 5000 Exception Access Violation Error

Question:

I am facing a challenge while working in RS Logix 5000. When I try to copy controller tags to a local routine, I encounter an exception access violation error. Despite trying various solutions and seeking help from more experienced individuals, I have not been able to resolve this issue. I urgently need assistance! Date: Tue Apr 24 09:53:50 2018 A fatal error has occurred while running RS Logix 5000. Application Path: C:\Program Files (x86)\Rockwell Software\RSLogix 5000\ENU\v20\Bin\RS5000.exe Elapsed execution time: 5 minutes & 10 seconds Version: V20.01.00 (Release) Source File: unknown Line Number: -1 Function/Method: unknown OS Version: Windows 7 64-bit (Service Pack 1 - Build 7601) Thread Id: 0000130c (4876) Error 0xc0000005 (-1073741819) EXCEPTION_ACCESS_VIOLATION - An "access violation" exception was generated. The currently open project file is located at: \\VBOXSVR\DESKTOP\WEEKLY X2435\PLC DESIGN\PLC PROGRAMS\18_04\MSSC_TEST_18_04_19_1630.ACD Work Path: C:\Users\Controlsuser\AppData\Local\Temp\RSLogix5000.Temp\AB_390C\AB_0124 Time open: 4 minutes & 21 seconds If you have any suggestions or solutions to fix this issue, please share them with me. Thank you for your help.

Top Replies

Explore the benefits of running as administrator by visiting this informative post on PLC Talk. Learn how to enhance system performance and troubleshoot issues effectively. Check out the post here: http://www.plctalk.net/qanda/showpost.php?p=684042&postcount=27.

I am in possession of....

Have you attempted to export, modify the scope in the CSV file, and then re-import the tags? Give it a try to enhance your workflow and organization!

Can you provide a more in-depth explanation of your actions? I'm a bit confused. Are you attempting to transfer tags between projects or within the same project? If so, what method are you using to copy the tags?

Hello everyone, I am currently experiencing an issue with copying controller tags and pasting them in a local routine within the same project in RSLOGIX 5000. This error is persisting across all projects I open in RSLOGIX 5000. Despite trying various solutions recommended here and elsewhere, the issue remains unresolved. I am using a Windows 10 computer running Windows 7 through a VM with RSLOGIX 5000 ver.20.04. Efforts made to address this problem include granting permissions to all users for access, using different or new projects, exporting as an L5X file and reloading into a new project, and trying a different VM with different projects. Some suggestions, such as locating and deleting .rnl files, were not feasible as the files could not be found in the suggested locations. While I may not be technically proficient, my IT support has also been unable to resolve this issue. Any assistance or guidance offered would be greatly appreciated.

I've actually run into this exception error before while working with RS Logix 5000 as well. It's a bit of a tricky issue, as it might be due to a couple of different factors. Firstly, I'd recommend checking whether your software is fully up-to-date and compatible with Windows 7 64-bit. If that's not the issue, it's quite possible you're running into a problem with user permissions - try running RSLogix as an administrator. Lastly, it could be related to a corrupted project file. Try opening a different project, and if that works fine, then it might imply the original one was problematic. Good luck!

It sounds like you're dealing with a pretty pesky issue here. First off, I'd suggest checking that you have the necessary permissions for the folders/files you're trying to access. An access violation error often means that the software is trying to reach a place where it doesn't have the required privileges. Additionally, this could be due to a corrupted project or software. Try recreating your project from scratch and, if that doesn't work, consider reinstalling RS Logix 5000. Also, ensure you have the latest updates for your operating system and RSLogix. Do remember to take backups before performing any of these steps. Hope this helps to resolve your issue.

It sounds like you're coping with a vexing problem! Usually, an ACCESS_VIOLATION error might be caused by compatibility issues with your current OS, indicating that the software is trying to access a memory or resource that isn’t normally available. First and foremost, ensure that you're running the software as an administrator. If this isn't enough, try to run it in compatibility mode for an older Windows version. Additionally, keep an eye on your antivirus software, it might be blocking some actions of the software. If all else fails, re-installing RSLogix 5000 might help. I understand these are some generic responses, however, pinpointing the exact problem without knowing further specifics is hard. If the problem persists, send a note to Rockwell support with your full system specifics, they might be able to assist you directly with this issue. Good luck!

It sounds really frustrating to be dealing with that access violation error! Have you tried running RS Logix 5000 as an administrator or checking if there are any updates or patches available for your version? Sometimes, compatibility issues can arise on certain Windows updates, so making sure everything is up to date can help. Additionally, you might want to consider checking your project file for any corrupted tags or elements that could be causing the crash. Good luck, and I hope you find a fix soon!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What is causing the exception access violation error in RS Logix 5000 while copying controller tags to a local routine?

Answer: - The exception access violation error in RS Logix 5000 can occur due to various reasons such as software conflicts, corrupted project files, insufficient system resources, or programming errors.

FAQ: 2. How can I troubleshoot the exception access violation error in RS Logix 5000?

Answer: - To troubleshoot the exception access violation error, you can try verifying the integrity of your project files, checking for software updates, ensuring your system meets the software requirements, and reviewing your programming logic for any potential errors.

FAQ: 3. Are there specific solutions recommended for resolving the exception access violation error in RS Logix 5000?

Answer: - Some solutions to resolve the exception access violation error in RS Logix 5000 include reinstalling the software, checking for compatibility issues with other installed programs, closing unnecessary background applications, and seeking assistance from experienced individuals or technical support.

FAQ: 4. Is there a way to prevent encountering the exception access violation error in RS Logix 5000 in the future?

Answer: - To prevent encountering the exception access violation error in RS Logix 5000, it is advisable to regularly update the software, maintain system cleanliness by removing unnecessary files and programs, follow best practices in programming, and ensure your hardware meets the software requirements.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →