How to Increase String Length from 82 to 150 in Studio 5000 Default Settings

Question:

Is it possible to increase the length of a string from 82 to 150 in Studio 5000 by default settings?

Top Replies

Thank you, guys, for understanding. Next time, it would be more beneficial to search for solutions on this website instead of relying on YouTube.

Introduction: The PLC-5 and SLC-500 operating systems featured a fixed-length String datatype limited to 82 characters. To ensure compatibility, the ControlLogix platform introduces a default STRING datatype comprising a .LEN value (4-byte DINT) and a SINT[82] byte array. It is important to note that the fixed length of the default STRING datatype cannot be altered. However, users have the flexibility to create a custom-length STRING formatted datatype within Studio 5000, allowing them to specify the desired length. This custom datatype will include a .LEN element and a set number of characters for .DATA[x]. Incorporating arrays of strings into User-Defined Types (UDTs) like Shrivsrikakolum does can lead to complexities and increased memory usage, which warrants a more in-depth discussion.

Ken is likely the best source of information on this topic, as I have always been curious - what was the reason behind 82 characters being the default? While newer processors maintained this length for legacy compatibility, the choice of 82 characters seems quite arbitrary. Why specifically 82 characters?

The origins of this likely date back to the traditional 80-column display and printer format, which used LF and CR characters at the conclusion of each string.

In Studio 5000, you have the flexibility to create custom-length STRING formatted datatypes of any desired length. These datatypes will include a .LEN element and a specified number of characters for .DATA[x]. When dealing with 82 character strings, it is important to consider how they are packed into memory for efficiency. If you frequently work with shorter strings (such as 10, 20, or even 2 characters), it may be more efficient to create your own datatype tailored to your specific needs.

Yes, it is possible, but you'll need to modify the "StringLength" attribute to do this. Understood that you must ensure your applications can handle increased string length correctly, as this could cause memory allocation concerns or unexpected behavior in the existing code. Always test thoroughly in a controlled environment before making changes like this to your live environment.

Unfortunately, in Studio 5000, the default string length is capped at 82 characters, and there’s no option to increase that limit in the standard settings. However, if you really need to handle larger strings, you might want to consider using a different data type, like a StringArray or using a UDT (User Defined Type) to store more data split across multiple strings. Just keep in mind this will require a bit more management on your end!

In Studio 5000, the default maximum length for a string is typically capped at 82 characters, so you can't directly expand it to 150 without some tweaks. However, you can achieve this by modifying the data type to an array of strings or utilizing a UDT (User-Defined Type) that accommodates longer strings. Just keep in mind that this may require some additional programming considerations to handle the data properly.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. Can the string length be increased from 82 to 150 in Studio 5000 using default settings?

Answer: - No, the default settings in Studio 5000 do not allow for directly increasing the string length from 82 to 150. Additional steps or configurations are required to achieve this.

FAQ: 2. What are the recommended steps to increase the string length in Studio 5000?

Answer: - To increase the string length from 82 to 150 in Studio 5000, you may need to modify the data type definition or structure configuration in the program. Consult the Studio 5000 documentation or seek assistance from Rockwell Automation support for detailed guidance.

FAQ: 3. Are there any implications or considerations to keep in mind when changing the string length in Studio 5000?

Answer: - Changing the string length in Studio 5000 may impact the memory allocation, program performance, and compatibility with other systems. It is advisable to thoroughly test the modifications and ensure they do not cause any unintended consequences before deploying them in a production environment.

FAQ: 4. Can the string length modification affect existing program logic or functionality in Studio 5000?

Answer: - Yes, changing the string length in Studio 5000 can potentially impact existing program logic or functionality that relies on the original string length. It is essential to review and update any affected code sections to ensure proper operation after the modification.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →