How to Install EDS File and Add on Profile for AB PLC Version Upgrade

Question:

We have upgraded our AB PLC from version 32.00 to the latest version, 35.01, using ControlFlash. However, we are unsure if the absence of an EDs file or any inactive Add on Profile may pose a risk of failure or hardware issues during the upgrade process. The Add on profile is currently not active, and although I have downloaded a file from the Rockwell site with some revisions, I have not yet updated it. Can someone provide a link or guidance on how to install the EDS file for this static switch? The image is hosted on ImgBB.

Top Replies

You do not need to run Controlflash separately to update the PLC version, as Studio 5000 has the capability to do so when you download the project. If you have an unused AOP that you're worried about causing issues, try upgrading a duplicate of your project offline first before making any changes to the PLC. This will help you determine if there are any potential problems.

From my experience, typically, if an Add-On Profile (AOP) isn't active or an Electronic Data Sheet (EDS) is missing, it might cause communication and configuration issues. That said, as long as your PLC is running without errors, an inactive AOP shouldn't be a significant issue. To install the EDS file for your static switch, you can use the EDS Hardware Installation Tool found within RSLinx Classic. Remember to backup your configuration before doing this. The Rockwell Knowledgebase (TechConnect required) provides a decent walkthrough - look up article ID# 21908. Be mindful when upgrading, as newer version might introduce new features that might affect your current setup.

It sounds like you've made a good step forward with the upgrade! For the EDS file, you can usually find the specific version you need directly on Rockwell's website under the Product Compatibility and Download Center. Just search for your device model, and it should lead you to the EDS file download link. Once you have it, you can install the EDS file using the RSNetWorx or FactoryTalk tools, depending on your setup. If the Add-on Profile is inactive and isn’t being used in your application, it might not pose an immediate risk, but it's still a good idea to have everything properly configured to avoid any unexpected issues down the line. Let me know if you need more help!

It's great that you've updated to version 35.01! Not having the EDS file can definitely lead to complications, especially with communication and device identification, so it's wise to address that. As for installing the EDS file, you can typically do this through the Rockwell's "RSLogix 5000" or "Studio 5000" software under the "Tools" menu. I recommend checking the Rockwell support site or the Knowledgebase for specific instructions or updates that may be required for your static switch. If you don't find what you need, consider reaching out to Rockwell support directly—they're usually very helpful!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What is the purpose of an EDS file and an Add on Profile for an Allen Bradley (AB) PLC version upgrade?

Answer: - An EDS file is used to configure devices on an industrial control network, and an Add on Profile contains information about a specific device for seamless integration with the PLC. Having these files ensures proper communication and functionality during upgrades.

FAQ: 2. Can the absence of an EDS file or an inactive Add on Profile cause issues during an AB PLC version upgrade?

Answer: - Yes, not having the necessary EDS file or an active Add on Profile can lead to communication errors, configuration issues, or improper functioning of devices connected to the PLC during the upgrade process.

FAQ: 3. How can I install an EDS file for a specific device, such as a static switch, after an AB PLC version upgrade?

Answer: - To install an EDS file for a specific device like a static switch, you can typically download the file from the manufacturer's website or a reliable source, then upload it to your PLC configuration software for proper device configuration.

FAQ: 4. Where can I find guidance or a link to download the EDS file for a static switch for my AB PLC version upgrade?

Answer: - You can usually find EDS files for various devices on the manufacturer's website or in online repositories dedicated to industrial automation resources. Ensure you download the correct version of the EDS file compatible with your PLC and device.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →