How to make a reset light flash in Rslogix5000 when E-stop is activated?

Question:

Greetings, I have been working on programming in Rslogix5000 and I have encountered a challenge regarding how to make a reset light flash when the E-stop is activated. In my program, I have included an E-Stop XIC at the start of each rung to ensure that the machine stops when the E-stop is activated. However, I am unsure how to incorporate a flashing light to indicate a reset while maintaining the functionality of the program. If I use an XIC for the light, it remains illuminated constantly until the E-stop is pressed. On the other hand, if I use an XIO, the light remains off until the E-stop is pressed. How can I make the reset light flash while ensuring that the program operates smoothly?

Top Replies

If you're in need of a "flasher" circuit, check out the following link for assistance. Feel free to reach out with any questions or concerns you may have.

@Marsbars2319 has provided the accurate solution. To further enhance your understanding, consider the following code snippet: In the code snippet below, a XIO flasherTON.DN instruction is used to trigger the TON flasherTON with a preset value of 1000 and a preset timeout value of 0. Additionally, the LES flasherTON.ACC instruction sets an accumulation value of 500. The logic also includes an XIC instruction for the emergency stop condition and an OTE instruction to activate the estopflasherOUT output. Furthermore, for a scenario with multiple outputs in a single rung, the code snippet includes instructions to increment the flasherINT value by 1, check if the value is within the range of 1023, and then execute specific actions based on different conditions like an emergency stop or other events. These examples demonstrate the complexity and versatility of ladder logic programming in industrial automation systems.

Frequently, a built-in clock pulse can be utilized to create a signal that flashes on and off at intervals of 0.5 seconds, mimicking a 1-second cycle. This feature is commonly applied in electronic devices and circuits for timing purposes.

Blinker bits are a widely utilized feature in programming. My AOI generates blinker bits at intervals of 250ms, 500ms, 1000ms, 2000ms, and custom rates. Additionally, the AOI produces a first scan bit that toggles between being On and Off. I recommend creating a global blinker within a shared routine to streamline its use throughout the codebase. Avoid generating a blinker exclusively for the estop function.

When working in RSLogix 5000, utilizing a built-in clock pulse can simplify tasks such as flashing a light on/off at regular intervals, like every 0.5 seconds. Alternatively, you can extract this value from the system clock or create your own timer, as suggested by Robertmee. It's common practice to use blinker bits in PLC programming, and there are AOIs available that generate blinker bits at various rates such as 250ms, 500ms, 1000ms, and 2000ms. These AOIs can also create other types of control bits like a first scan bit, which is always On or Off. For efficiency and reusability, consider creating a global blinker in a shared routine that can be accessed throughout the code rather than creating individual blinkers for specific functions like an emergency stop.

It sounds like you might need to incorporate a timer into your program. A TON (Timer On Delay) or TOF (Timer Off Delay) could be beneficial for this task. By incorporating a timer, you can cause the light to blink (on/off) at intervals once the E-stop is activated. For smooth operation, ensure a condition checks if the E-Stop XIC is true before it starts the timer. Always test the functionality before incorporating this change into the main system.

It sounds like you're on the right track with your E-stop logic! To make the reset light flash while the E-stop is activated, you could use a timer in conjunction with your E-stop conditions. Instead of just using an XIC or XIO for the light, you can add a TON (timer on) instruction to create a blink effect. When the E-stop is pressed, enable the timer, and in the rung controlling your light, use a comparison with the timer's done bit to toggle the output. You could set the timer for a short interval to create a flashing effect, like turning the light on for 0.5 seconds and off for 0.5 seconds. Just make sure that your E-stop logic still takes precedence so the machine can safely halt!

It sounds like you're on the right track with your logic using XIC and XIO, but for the flashing light, you might want to consider using a timer. You can set up a timer that triggers when the E-stop is activated. Once the timer reaches a certain value, you can toggle an output for your reset light. This way, you can have it flash at a specific interval, and your program will still stop as expected with the E-stop condition. Just make sure to reset the timer appropriately when the E-stop is cleared to avoid any unintended behavior!

It sounds like you’re on the right track with the XIC and XIO, but what you need is a way to control the flashing of the light independently from the E-stop status. One approach is to use a timer that is triggered when the E-stop is activated; you can set it to toggle the output for your reset light on and off at a set interval. So, when the E-stop is pressed and the XIC for the E-stop is true, the timer starts, and it can periodically toggle the reset light's output, creating the flashing effect you want. Just make sure the output remains off once the E-stop is released to maintain safety. This setup should keep your functionality intact while providing a clear visual indication.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I make a reset light flash in Rslogix5000 when the E-stop is activated?

Answer: To make a reset light flash when the E-stop is activated in Rslogix5000, you can use a combination of XIC and XIO instructions to create a flashing effect. By toggling the output bit with a timer and controlling the flashing frequency, you can achieve the desired functionality.

FAQ: 2. Why does the reset light remain constantly illuminated when using an XIC in Rslogix5000?

Answer: When using an XIC instruction for the reset light, it remains constantly illuminated because the input condition is true as long as the E-stop is not pressed. To make the light flash, you need to introduce logic that alternates the output state based on a timer or other conditions.

FAQ: 3. Why does the reset light stay off until the E-stop is pressed when using an XIO in Rslogix5000?

Answer: When using an XIO instruction for the reset light, it stays off until the E-stop is pressed because the input condition is false until the E-stop is activated. To create a flashing effect, you need to implement additional logic to control the light output based on certain conditions.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →