How to Measure Hydraulic Pressure Using a 4-20mA Signal: Scaling and Calculation Techniques

Question:

I am seeking guidance on effectively measuring hydraulic pressure using a 4-20mA signal. When setting the scaling input, should I set the minimum to 4000 and the maximum to 20000? What are the appropriate scaling values for this setup? I know the maximum is typically 32767 but unsure about the minimum. Additionally, how can I calculate the output in bar and psi? Any advice on this would be greatly appreciated.

Top Replies

Which type of analog card are you utilizing, as there are various cards with different functionalities?

In 1769, my thoughts revolve around the implications of If8 technology.

The price range for this option can vary from 4k to 20k, depending on the configuration of the channel. For more information, please visit the link: "seehere" (a non-@OkiePC-safe link).

In order to accurately represent process data in engineering units, it is recommended to scale channel data from 4000 to 20000, corresponding to 4.000mA to 20.000mA. This scaling should be applied to all channels for consistency. By using a scale block or CPT block in ladder programming, the 4000 to 20000 range can be converted into pressure, level, temperature, or any other process data. This approach ensures uniformity in channel data setup and facilitates easy interpretation of the scaling process into actual process units.

Thank you for the clarification. According to my research, the engineering value is typically set to 3277 for low and 16383 for high, corresponding to a 4-20 mA output. How do you convert this value to psi measurement?

In general, for a 4-20mA signal, you would want to set your scaling minimum to 4 and maximum to 20, as these numbers correlate with the range of your signal. These values represent the full pressure range of your hydraulic system. In terms of converting the output, you would typically need to know the specifics of your system, such as the pressure range it's mapped to and the units. For example, if your 4-20mA represents a pressure range of 0 to 100psi, then a 4mA signal would be 0psi and a 20mA signal would be 100psi. To convert psi to bar, you can use the formula: 1 psi = 0.0689476 bar. Remember, this conversion entirely depends on the pressure range of your specific system.

When you're setting up a 4-20mA signal for measuring hydraulic pressure, you'll want to scale your input based on the actual range of pressure you expect to measure. If your minimum pressure is 4000 and your maximum is 20000, those values make sense for your scaling. However, ensure that these values are actually representative of your pressure range. For conversion, if you're measuring in bar, you can set your output range to reflect that granularity—like 0-10 bar corresponding to 4-20 mA, for example. To convert that to psi, remember that 1 bar is approximately 14.5 psi. Just multiply your bar reading by 14.5 to get psi. It's always a good practice to double-check your setup with actual pressure readings to confirm accuracy!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What are the recommended scaling values for measuring hydraulic pressure using a 4-20mA signal?

Answer: Answer: For a 4-20mA signal, the typical scaling values are 4000 for the minimum and 20000 for the maximum. This configuration allows for accurate measurement within the specified range.

FAQ: 2. How can I calculate the output pressure in bar and psi from a 4-20mA signal measurement?

Answer: Answer: To convert the 4-20mA signal to pressure units such as bar and psi, you can use the scaling values along with a linear conversion formula. For example, if the scaling is set from 4000 to 20000, you can map the 4-20mA range to the desired pressure units accordingly.

FAQ: 3. Is it necessary to consider the full range of values (0-32767) when setting up the scaling for hydraulic pressure measurement with a 4-20mA signal?

Answer: Answer: While the maximum value for a 4-20mA signal is typically 32767, it is common practice to scale the input range based on the specific requirements of the application. Setting the scaling from 4000 to 20000 allows for a more focused and precise measurement within the intended pressure range.