How to Properly Import Compact Logix Tags into C-More CM5 HMI Project

Question:

I have extensive experience in programming Studio 5000 PLCs and C-More HMIs. However, integrating a C-More HMI with a Compact Logix PLC is a new challenge for me. I am currently facing difficulties in exporting my PLC tags for import into my C-More HMI project. In Studio 5000 v33.11, I have only found options to export tags in .CSV or .TXT formats. After reaching out to Automation Direct Tech Support, I was advised to export the tags in an .L5X file format. Despite multiple attempts using the .CSV and .TXT files, I have been unable to successfully import the tags. I am seeking guidance on how to properly import my tags into my C-More CM-5 project. Thank you for your assistance.

Top Replies

Have you attempted to save your project in the L5X file format? To do so, navigate to File -> Save As and choose L5X (or L5K) from the file type dropdown menu. Alternatively, you can create a tag of each type in the C-More software, export it to understand the format, use Excel to match the Logix file format to the C-More file, and transfer the tags before re-importing. Keep in mind that you may need to make adjustments to the CSV file, as Excel tends to add or remove elements like single quotes that are necessary for C-More compatibility. In such cases, using find & replace in Notepad++ after making edits in Excel may be necessary.

Appreciate the help, Joseph_e2! Converting my project, particularly the primary program, to an L5X file solved the issue.

This integration might initially seem challenging, but it's definitely doable. For importing the tags, you need an intermediate software between Studio5000 and C-More - such as Rockwell's RSLogix 5000. It can export the tags into an L5K file, which C-More software should accept. Just ensure that in this process, all your data types in Studio5000 are supported in C-More. In case you stumble upon an unsupported data type, consider manually creating it in the C-More software. I hope this helps, and do let me know how it turns out!

Sure, I've encountered a similar situation before. In Studio 5000, you actually must export the tags in a ".L5K" format, not ".L5X". This is accomplished by going to File -> Save As -> L5K. Once you have it saved as an L5K, open the file in Notepad or another text editor and convert it to a CSV file by replacing each semicolon (;) with a comma (,). Now you should be able to import the tags into your C-More project. Remember to import PLC tags correctly in the C-More software, you may then need to setup you protocol accordingly. Hope this helps!

I understand your struggle, I've been there before! In Studio 5000, there's no direct way to export in .L5X format. What you can do instead is save the project as .L5K or archive the project as .ACP, then manually change the extension to .L5X. Now when you import the file into your C-More project, the tags should come in without a hitch. Remember to ensure your software versions between both the PLC and HMI are compatible to prevent further issues. Taking a step further, you could use an OPC server for real-time data exchange, though that's more complex. Hope this helps and let us know how you get on!

I totally understand the hurdle you're encountering. When using the Compact Logix PLC with the C-More HMI, the HMI software should theoretically be able to directly pull all tag names from the PLC program provided you have an Ethernet connection between the two. If that isn't working, you can try exporting them in .L5X format as advised by Automation Direct. In Studio 5000, look under Tools -> Export -> Logic and choose the .L5X format. This should include all your tags. Then, you can import them into your C-More project. Remember it's essential to configure your Ethernet connection and match the IP address ranges appropriately for seamless operation. If this doesn't work, there may be an issue either with the software versions or the communication settings.

It sounds like you’re really diving deep into the integration process! For the C-More HMI, it can be a bit tricky since it doesn’t natively understand .CSV or .TXT formats like you might hope. Instead, I’d recommend following Automation Direct's advice and using the .L5X format, which is designed for exporting and importing tags in a way that’s better suited for this kind of application. You could also try manually creating the tags in the C-More software to ensure they align with what you have in your PLC. If you’re still running into issues, sharing specific errors you get during the import might help others provide more targeted advice. Good luck!

It sounds like you're in a tough spot, but you're on the right track with using the .L5X export; that's the best way to ensure all your tags come through properly. Once you export your tags in the .L5X format, you can try using the C-More Setup software to import directly from that file. If that doesn't work, you might also want to check that you're mapping the tags correctly during the import process, as sometimes a mismatch can prevent successful integration. Additionally, the manuals for both devices usually have specifics on tag import processes that might be helpful. Good luck, and don't hesitate to share what works for you!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. What file format should I use to export Compact Logix PLC tags for importing into a C-More CM5 HMI project?

Answer: Answer: To properly import Compact Logix tags into a C-More CM5 HMI project, it is recommended to export the tags in an .L5X file format.

FAQ: 2. I am facing difficulties importing PLC tags into my C-More HMI project. What can I do to resolve this issue?

Answer: Answer: If you are experiencing issues with importing tags, ensure that you are exporting the tags from Studio 5000 in the correct .L5X format instead of .CSV or .TXT files.

FAQ: 3. How can I export Compact Logix PLC tags in Studio 5000 for integration with a C-More HMI?

Answer: Answer: In Studio 5000 v33.11, look for the option to export tags in the .L5X file format. This format is recommended for successful import into a C-More CM5 HMI project.

FAQ: 4. I have experience with Studio 5000 PLCs and C-More HMIs but am new to integrating a Compact Logix PLC with a C-More HMI. Any tips for a smooth integration process?

Answer: Answer: When integrating a Compact Logix PLC with a C-More HMI, ensure you export your PLC tags in the .L5X file format for seamless