How to Re-Import DXF Files with EPLAN Layers and Symbols

Question:

Hey there, I'm working on a project that was exported from EPLAN to dxf. Unfortunately, I don't have the original project file. I'm looking to re-import the dxf back into EPLAN, ensuring that all the EPLAN layers are retained, including symbols and devices. Currently, when I import the dxf pages, everything comes in as blocks. If I explode these blocks, I can see lines, but I'm unable to automatically number contacts and devices when making changes to the drawing. Is there a solution to this issue?

Top Replies

Greetings! To make any modifications, please ensure you have an eplan project export file in either .zw1 or .elx format.

Hey! It seems like you're facing a common problem when importing DXF files into EPLAN. Unfortunately, EPLAN doesn't recognize the symbols, devices, and contacts when they're in DXF format, so it treats them as basic elements or blocks. As far as I know, there's no direct way to convert these into EPLAN objects with automated numbering. The best solution might be to manually replace each with the corresponding EPLAN object once you've got your project in EPLAN. It's a bit of a drawn-out process, but I'm afraid it's the most reliable workaround. Hope this helps!

Hey there, it seems the issue you're facing specifically lies in the loss of EPLAN project metadata when exporting to dxf, which is a fairly tricky problem to resolve directly. However, I'd suggest an indirect method where you utilize AutoCAD or an equivalent software to delve deeper into the blocks created from your dxf import. After exploding the blocks, you can edit as per your requirements and then save it back as a dxf. Once this is done, re-import it into EPLAN. While this is an elaborate process, it might let you retain the necessary information and enable automatic numbering. It's a workaround, not a perfect solution, but it might do the trick until there's a direct solution in EPLAN itself.

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. How can I re-import a DXF file with EPLAN layers and symbols while retaining the original project's details? - To re-import a DXF file with EPLAN layers and symbols intact, ensure you have the original project file. If not, you may encounter difficulties in maintaining the structure and attributes during the import process.

FAQ: 2. Why do the EPLAN layers and symbols not transfer properly when re-importing a DXF file?

Answer: - The issue of EPLAN layers and symbols not transferring correctly during the re-import of a DXF file may arise due to the loss of original project information. Without the original project file, the system may struggle to interpret the data accurately.

FAQ: 3. How can I address the problem of imported elements appearing as blocks instead of individual components?

Answer: - If the imported elements from the DXF file are showing up as blocks instead of separate components, try exploding the blocks to reveal the individual lines. However, be aware that this manual process may impact the ability to automatically number contacts and devices during drawing modifications.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →