How to Remove an Add-On Instruction (AOI) from a ControlLogix Project

Question:

Are you looking for a way to remove an Add-On Instruction (AOI) from a ControlLogix project? Despite consulting the RA Add-On manual and searching online, I am unable to find a solution. One possible method I considered is performing an .L5k export, locating and removing all references, and then importing the .L5k file again. However, this process seems cumbersome. If you have any suggestions, please share. Thank you, Brad.

Top Replies

In order to remove all mentioned references, the AOI can only be deleted when offline. This process is essential for maintaining the integrity of the data and system.

In order to effectively remove the instruction from your program, you must also delete any Tags associated with the AOI-specific Data Type. This ensures a thorough clean-up of all related components.

Thank you, Ken, that was the solution I needed. I had overlooked adding a program-scope tag. You made my day, thanks once again! - Brad

Even after 5 years, this response continues to provide valuable assistance. Ken, do you still frequent this forum to see the latest updates?

If the delete option is still grayed out even after clearing all references and linked variables, try rebooting the program. I encountered this issue on version 30.01.00.

Hey Brad, I understand your predicament. You're right, the .L5k export/import method does seem a bit cumbersome. Usually, to remove an AOI from a ControlLogix project, you'd first need to ensure that there are no rungs or tags using the AOI. After that, right-click the AOI in the Controller Organizer and select "Delete". If the option is greyed out, it confirms that there are some unaccounted references to the AOI in the project. So, you would need to track those down first. Also, remember to always keep backups before making major alterations. Hope this helps!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I remove an Add-On Instruction (AOI) from a ControlLogix project?

Answer: - One possible method is to perform an .L5k export, locate and remove all references to the AOI, and then import the modified .L5k file back into the project. However, this process can be cumbersome.

FAQ: 2. Are there any other methods to remove an AOI more efficiently from a ControlLogix project?

Answer: - While the .L5k export method is one way to remove an AOI, you may also consider reviewing the project structure to identify and delete the AOI directly within the ControlLogix software.

FAQ: 3. I'm having trouble finding a solution to remove an AOI despite consulting the RA Add-On manual and searching online. Any suggestions?

Answer: - If you are struggling to find a solution, consider reaching out to the Rockwell Automation support team for assistance or posting your query on relevant forums for expert advice.

FAQ: 4. Will removing an AOI impact the functionality of my ControlLogix project?

Answer: - Removing an AOI can affect the logic and behavior of your project. Ensure that you carefully review and modify any associated logic or connections to prevent disruptions in the system's operation.

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →