How to Remove TwinCAT3.1 Modbus Server Warning: File Not Found in COM Server List!

Question:

Hello! I need help with removing the bothersome TwinCAT3.1 warning about the Modbus server. I initially installed the option for testing purposes, but upon discovering that it required a license, I uninstalled it. I am currently utilizing a Beckoff PLC, with both the engineering environment and the PLC itself operating on the same IPC. Your assistance in resolving this issue would be greatly appreciated. Thank you for reading and for any help you can provide.

Top Replies

I don't have an answer at the moment, but I am genuinely intrigued by the question. Therefore, I am posting this to stay updated on any future discussions related to this topic.

We are currently without assistance, and as this service is free, there is no guarantee that I will receive a solution. Nonetheless, I will persist in my efforts. Should I solve this frustrating issue, I will post an update for your benefit.

I believe I have successfully solved this problem.

Hi there! It sounds like you've been through a bit of a hassle with the Modbus server warning. One thing you might try is checking the TwinCAT System Manager to ensure that any remaining references to the Modbus server have been completely removed after uninstallation. Sometimes lingering configurations can trigger those warnings. If that doesn’t help, you could also try clearing the project's cache or, as a last resort, reinstalling the TwinCAT environment—just remember to back up your existing projects first. Good luck!

Hi there! It sounds like you’re dealing with a stubborn warning. Have you tried checking the TwinCAT configuration settings to see if there are any remnants of the Modbus server still active? Sometimes, even after uninstallation, the settings can linger and cause warnings. You might also want to look into the "TwinCAT System Manager" to ensure the Modbus server is completely disabled. If that doesn't work, a clean reinstall of TwinCAT might help reset everything. Good luck!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: 1. How can I remove the TwinCAT3.1 Modbus Server warning about 'File Not Found in COM Server List'?

Answer: - To remove this warning, you should first ensure that you have uninstalled the Modbus server option that was installed for testing purposes. If you have uninstalled it and are still seeing the warning, there may be some remnants of the installation left. You can try reinstalling and then uninstalling the Modbus server again to see if that resolves the issue.

FAQ: 2. What should I do if I uninstalled the Modbus server but still see the warning in TwinCAT3.1?

Answer: - If you have already uninstalled the Modbus server but are still encountering the warning, you can try checking if there are any leftover files or configurations causing the issue. Reinstalling and then properly uninstalling the Modbus server might help in clearing out any remaining traces causing the warning.

FAQ: 3. I have a Beckoff PLC with the engineering environment and PLC running on the same IPC. How can I resolve the TwinCAT3.1 Modbus Server warning in this setup?

Answer: - In a setup where both the engineering environment and the PLC are on the same IPC, ensuring that the Modbus server is correctly uninstalled and any associated files are removed is crucial. You may also want to check the TwinCAT3.1 configuration to verify that the Modbus server option is no longer present in the COM Server list to

Ready to Simplify Maintenance?

Join hundreds of satisfied customers who have transformed their maintenance processes.
Sign up today and start optimizing your workflow.

Request Demo  →