How to Replace Broken Display on PowerFlex 70 Drive Without Program Transfer?

Question:

While my PowerFlex 70 drive's display is broken, it is still running in auto mode. I have extensively looked for a way to replace the display without having to transfer the program. As a newcomer to this, I am unsure if the program is stored in the display or elsewhere in the drive. I am hesitant to interrupt production without certainty. I would appreciate any guidance on how to proceed without causing any downtime. Thank you in advance.

Top Replies

To the best of my recollection, the drive parameters are stored within the drive itself, requiring the use of drive executive for uploading. I recall that removing the HIM may result in an error message, but it should not affect the drive's operation. From what I understand, the HIM does not store the drive's setup settings.

According to parky, the parameters for the drive are stored within it, requiring the use of drive executive for retrieval. Removing the HIM may prompt an error message, but won't halt the drive's operation. It appears that the HIM does not retain the setup information, as confirmed when successfully swapping the display while the drive was still running smoothly. This adjustment was made without any issues, proving your earlier statement correct. Thank you for your input!

Saving parameters to the HIM for backup or easy transfer to another drive is a common practice. However, it is important to note that any changes made to drive parameters will not automatically update in the existing HIM save. Therefore, it is necessary to manually trigger a new save if any changes need to be backed up. We make sure to back up all our drives with this feature to ensure a smooth drive replacement process. If you have experienced a faulty HIM, it is possible that a removal fault has occurred and been reset at some point. Proper removal involves using the ALT - Remove - Enter command to prevent the drive from faulting. It is important to follow this procedure to avoid any disruptions in drive operation. It is worth noting that a fault may not necessarily stop a running drive as expected.

I have found success using CCW for my PF525 and 750 series drives. James

From my understanding and experience, the program of the PowerFlex 70 isn't stored in its display but in the drive itself. So, if the display is broken, replacing it shouldn't affect the program as long as the drive is actually working fine. However, to avoid any downtime, I would highly recommend consulting either with Rockwell Automation support or an industrial automation expert to guide you appropriately on replacing the display without disrupting production. Always wise to get professional advice before taking any step that could impact your production line.

From my understanding, the program isn't typically stored in the display, but rather in the main drive processing unit. Therefore, replacing the display shouldn't interfere with your running program. Nonetheless, I'd advise you to take a backup of your program settings before starting the process, just to be on the safe side. Many manufacturers, like Allen Bradley, provide manuals on how to do this, so check that out. Also, depending on your setup, it might be possible to run the display replacement while the system is still in operation, minimizing potential downtime. Hope this helps!

It sounds like you're in a tricky situation! The good news is that the program for your PowerFlex 70 drive is typically stored in the drive itself, not the display. Before switching out the display, you might want to check the manual or reach out to Allen-Bradley support to confirm that your specific model can have the display replaced without losing your settings. Additionally, if possible, take screenshots of your current parameters or back them up using programming software, just in case. This way, even if something goes awry, you have a fallback. Good luck, and I hope you can replace the display without any hiccups!

More Replies →

Streamline Your Asset Management
See How Oxmaint Works!!

✅   Work Order Management

✅   Asset Tracking

✅   Preventive Maintenance

✅   Inspection Report

We have received your information. We will share Schedule Demo details on your Mail Id.

You must be a registered user to add a comment. If you've already registered,
sign in. Otherwise, register and sign in.

Frequently Asked Questions (FAQ)

FAQ: FAQs:

Answer: 1. Q: Is the program stored in the display of a PowerFlex 70 drive? No, the program is not stored in the display. It is typically stored elsewhere in the drive's memory or on an external device.

FAQ: 2. Can the broken display on a PowerFlex 70 drive be replaced without transferring the program?

Answer: Yes, it is possible to replace the broken display without transferring the program. The program is separate from the display unit.

FAQ: 3. How can I replace the broken display on a PowerFlex 70 drive without causing downtime?

Answer: To replace the display without interrupting production, it is advisable to consult the drive's manual or seek assistance from a qualified technician. Disconnecting power before replacing the display is crucial to avoid any disruptions.